Armenia vs Solomon Islands: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Armenia
- Solomon Islands
How they compare
Armenia currently reports 99 days against 99 days in Solomon Islands, a difference of 0 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Armenia ahead.
Armenia ranks 143rd and Solomon Islands ranks 143rd of 185 countries.
Armenia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Armenia | Solomon Islands | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 182.8 days | 99 days | 83.8 days | Armenia |
| 2010s | 106.1 days | 99 days | 7.1 days | Armenia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Armenia or Solomon Islands?
- Armenia, at 99 days against 99 days in Solomon Islands as of 2019.
- What is the difference in dealing with construction permits: time between Armenia and Solomon Islands?
- 0 days, with Armenia ahead.
- How many years of comparable data are there for Armenia and Solomon Islands?
- 15 years are reported by both, from 2005 to 2019.
- How do Armenia and Solomon Islands rank globally for dealing with construction permits: time?
- Armenia ranks 143rd and Solomon Islands ranks 143rd of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.