Australia vs Burkina Faso: Dealing with construction permits: Time

Australia
120.5 days
in 2019
Burkina Faso
121 days
in 2019
Australia rank
115th
Burkina Faso rank
113th

Dealing with construction permits: Time over time

  • Australia
  • Burkina Faso
050100150200200520122019

How they compare

Burkina Faso currently reports 121 days against 120.5 days in Australia, a difference of 0.5 days.

Across all 15 years both countries report, Burkina Faso has been ahead every year.

Australia ranks 115th and Burkina Faso ranks 113th of 187 countries.

Burkina Faso has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Australia Burkina Faso Difference Ahead
2000s 136 days 188 days 52 days Burkina Faso
2010s 115.55 days 121 days 5.45 days Burkina Faso

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Australia or Burkina Faso?
Burkina Faso, at 121 days against 120.5 days in Australia as of 2019.
What is the difference in dealing with construction permits: time between Australia and Burkina Faso?
0.5 days, with Burkina Faso ahead.
How many years of comparable data are there for Australia and Burkina Faso?
15 years are reported by both, from 2005 to 2019.
How do Australia and Burkina Faso rank globally for dealing with construction permits: time?
Australia ranks 115th and Burkina Faso ranks 113th of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Australia vs Burkina Faso: Dealing with construction permits: Time. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/australia/burkina-faso/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/australia/burkina-faso/">Australia vs Burkina Faso: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.