Australia vs Democratic Republic of Congo: Dealing with construction permits: Time (days) (Time days)

Australia
120.5 days
in 2019
Democratic Republic of Congo
122 days
in 2019
Australia rank
116th
Democratic Republic of Congo rank
113th

Dealing with construction permits: Time (days) (Time days) over time

  • Australia
  • Democratic Republic of Congo
050100150200250200520122019

How they compare

Democratic Republic of Congo currently reports 122 days against 120.5 days in Australia, a difference of 1.5 days.

Across all 15 years both countries report, Democratic Republic of Congo has been ahead every year.

Australia ranks 116th and Democratic Republic of Congo ranks 113th of 188 countries.

Democratic Republic of Congo has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Australia Democratic Republic of Congo Difference Ahead
2000s 136 days 239 days 103 days Democratic Republic of Congo
2010s 115.55 days 126.4 days 10.85 days Democratic Republic of Congo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Australia or Democratic Republic of Congo?
Democratic Republic of Congo, at 122 days against 120.5 days in Australia as of 2019.
What is the difference in dealing with construction permits: time between Australia and Democratic Republic of Congo?
1.5 days, with Democratic Republic of Congo ahead.
How many years of comparable data are there for Australia and Democratic Republic of Congo?
15 years are reported by both, from 2005 to 2019.
How do Australia and Democratic Republic of Congo rank globally for dealing with construction permits: time?
Australia ranks 116th and Democratic Republic of Congo ranks 113th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Australia vs Democratic Republic of Congo: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/australia/congo-dem-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/australia/congo-dem-rep/">Australia vs Democratic Republic of Congo: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.