Australia vs Congo, Dem. Rep.: Dealing with construction permits: Time

Australia
120.5 days
in 2019
Congo, Dem. Rep.
122 days
in 2019
Australia rank
113th
Congo, Dem. Rep. rank
110th

Dealing with construction permits: Time over time

  • Australia
  • Congo, Dem. Rep.
050100150200250200520122019

How they compare

Congo, Dem. Rep. currently reports 122 days against 120.5 days in Australia, a difference of 1.5 days.

Across all 15 years both countries report, Congo, Dem. Rep. has been ahead every year.

Australia ranks 113th and Congo, Dem. Rep. ranks 110th of 185 countries.

Congo, Dem. Rep. has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Australia Congo, Dem. Rep. Difference Ahead
2000s 136 days 239 days 103 days Congo, Dem. Rep.
2010s 115.55 days 126.4 days 10.85 days Congo, Dem. Rep.

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Australia or Congo, Dem. Rep.?
Congo, Dem. Rep., at 122 days against 120.5 days in Australia as of 2019.
What is the difference in dealing with construction permits: time between Australia and Congo, Dem. Rep.?
1.5 days, with Congo, Dem. Rep. ahead.
How many years of comparable data are there for Australia and Congo, Dem. Rep.?
15 years are reported by both, from 2005 to 2019.
How do Australia and Congo, Dem. Rep. rank globally for dealing with construction permits: time?
Australia ranks 113th and Congo, Dem. Rep. ranks 110th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.