Australia vs Mozambique: Dealing with construction permits: Time

Australia
120.5 days
in 2019
Mozambique
118 days
in 2019
Australia rank
113th
Mozambique rank
115th

Dealing with construction permits: Time over time

  • Australia
  • Mozambique
050100150200250200520122019

How they compare

Australia currently reports 120.5 days against 118 days in Mozambique, a difference of 2.5 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Mozambique ahead.

Australia ranks 113th and Mozambique ranks 115th of 185 countries.

Mozambique has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Australia Mozambique Difference Ahead
2000s 136 days 242 days 106 days Mozambique
2010s 115.55 days 159 days 43.45 days Mozambique

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Australia or Mozambique?
Australia, at 120.5 days against 118 days in Mozambique as of 2019.
What is the difference in dealing with construction permits: time between Australia and Mozambique?
2.5 days, with Australia ahead.
How many years of comparable data are there for Australia and Mozambique?
15 years are reported by both, from 2005 to 2019.
How do Australia and Mozambique rank globally for dealing with construction permits: time?
Australia ranks 113th and Mozambique ranks 115th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.