Austria vs Papua New Guinea: Dealing with construction permits: Time

Austria
222 days
in 2019
Papua New Guinea
217 days
in 2019
Austria rank
27th
Papua New Guinea rank
29th

Dealing with construction permits: Time over time

  • Austria
  • Papua New Guinea
050100150200200520122019

How they compare

Austria currently reports 222 days against 217 days in Papua New Guinea, a difference of 5 days.

Across all 15 years both countries report, Austria has been ahead every year.

Austria ranks 27th and Papua New Guinea ranks 29th of 185 countries.

Austria has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Austria Papua New Guinea Difference Ahead
2000s 222 days 217 days 5 days Austria
2010s 222 days 217 days 5 days Austria

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Austria or Papua New Guinea?
Austria, at 222 days against 217 days in Papua New Guinea as of 2019.
What is the difference in dealing with construction permits: time between Austria and Papua New Guinea?
5 days, with Austria ahead.
How many years of comparable data are there for Austria and Papua New Guinea?
15 years are reported by both, from 2005 to 2019.
How do Austria and Papua New Guinea rank globally for dealing with construction permits: time?
Austria ranks 27th and Papua New Guinea ranks 29th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.