Dealing with construction permits: Time in Papua New Guinea

Papua New Guinea: Dealing with construction permits: Time was 217 days in 2019. ▬ Flat

Latest (2019)
217 days
Change on year
unchanged
World rank
29th
of 185 countries
All-time high
217 days
in 2005
All-time low
217 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Papua New Guinea, 2005–2019

0501001502002005201220192005: 217 days2006: 217 days2007: 217 days2008: 217 days2009: 217 days2010: 217 days2011: 217 days2012: 217 days2013: 217 days2014: 217 days2015: 217 days2016: 217 days2017: 217 days2018: 217 days2019: 217 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Papua New Guinea is 217 days, measured in 2019. That is the highest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Papua New Guinea peaked at 217 days in 2005 and was at its lowest, 217 days, in 2005.

That places Papua New Guinea 29th out of 185 countries with data for 2019, putting it in the top quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 217 days 217 days 217 days 5
2010s 217 days 217 days 217 days 10

Countries ranked near Papua New Guinea

  1. 26 Suriname 223 days compare
  2. 27 Austria 222 days compare
  3. 28 Central African Republic 219 days compare
  4. 30 France 213 days compare
  5. 31 Belgium 212 days compare
  6. 32 Guyana 208 days compare

See the full ranking of 187 places →

More private sector data for Papua New Guinea

All data for Papua New Guinea →

Frequently asked questions

What is dealing with construction permits: time in Papua New Guinea?
Dealing with construction permits: time in Papua New Guinea was 217 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Papua New Guinea?
The highest recorded value was 217 days in 2005.
What is the lowest dealing with construction permits: time recorded in Papua New Guinea?
The lowest recorded value was 217 days in 2005.
How does Papua New Guinea rank for dealing with construction permits: time?
Papua New Guinea ranks 29th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Papua New Guinea?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Papua New Guinea data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.