Dealing with construction permits: Time (days) (Time days) in Papua New Guinea

Papua New Guinea: Dealing with construction permits: Time was 217 days in 2019. ▬ Flat

Latest (2019)
217 days
Change on year
unchanged
World rank
31st
of 188 countries
All-time high
217 days
in 2005
All-time low
217 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Papua New Guinea, 2005–2019

0501001502002005201220192005: 217 days2006: 217 days2007: 217 days2008: 217 days2009: 217 days2010: 217 days2011: 217 days2012: 217 days2013: 217 days2014: 217 days2015: 217 days2016: 217 days2017: 217 days2018: 217 days2019: 217 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Papua New Guinea is 217 days, measured in 2019. That is the highest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Papua New Guinea peaked at 217 days in 2005 and was at its lowest, 217 days, in 2005.

That places Papua New Guinea 31st out of 188 countries with data for 2019, putting it in the top quarter.

Dealing with construction permits: Time in Papua New Guinea, year by year

Annual values for Dealing with construction permits: Time (days) in Papua New Guinea, 2005 to 2019.
Year days Change
2005 217 days —
2006 217 days +0.0%
2007 217 days +0.0%
2008 217 days +0.0%
2009 217 days +0.0%
2010 217 days +0.0%
2011 217 days +0.0%
2012 217 days +0.0%
2013 217 days +0.0%
2014 217 days +0.0%
2015 217 days +0.0%
2016 217 days +0.0%
2017 217 days +0.0%
2018 217 days +0.0%
2019 217 days +0.0%

Papua New Guinea compared with similar countries

  • Papua New Guinea's 217 days is above the median for lower middle income countries, which is 159 days, 1.4× the median. (47 countries reporting)
  • Papua New Guinea's 217 days is above the median for East Asia & Pacific, which is 103.67 days, 2.1× the median. (28 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 217 days 217 days 217 days 5
2010s 217 days 217 days 217 days 10

Countries ranked near Papua New Guinea

  1. 28 Suriname 223 days compare
  2. 29 Austria 222 days compare
  3. 30 Central African Republic 219 days compare
  4. 32 France 213 days compare
  5. 33 Belgium 212 days compare
  6. 34 Guyana 208 days compare

See the full ranking of 188 places →

More private sector data for Papua New Guinea

All data for Papua New Guinea →

Frequently asked questions

What is dealing with construction permits: time in Papua New Guinea?
Dealing with construction permits: time in Papua New Guinea was 217 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Papua New Guinea?
The highest recorded value was 217 days in 2005.
What is the lowest dealing with construction permits: time recorded in Papua New Guinea?
The lowest recorded value was 217 days in 2005.
How does Papua New Guinea rank for dealing with construction permits: time?
Papua New Guinea ranks 31st out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Papua New Guinea?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Papua New Guinea data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Papua New Guinea. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/papua-new-guinea/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/papua-new-guinea/">Dealing with construction permits: Time in Papua New Guinea</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.