Dealing with construction permits: Time in Austria

Austria: Dealing with construction permits: Time was 222 days in 2019. ▬ Flat

Latest (2019)
222 days
Change on year
unchanged
World rank
27th
of 185 countries
All-time high
222 days
in 2005
All-time low
222 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Austria, 2005–2019

0501001502002005201220192005: 222 days2006: 222 days2007: 222 days2008: 222 days2009: 222 days2010: 222 days2011: 222 days2012: 222 days2013: 222 days2014: 222 days2015: 222 days2016: 222 days2017: 222 days2018: 222 days2019: 222 days

Source: World Bank. Measured in days.

Analysis

Austria recorded 222 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.

The figure is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Austria peaked at 222 days in 2005 and was at its lowest, 222 days, in 2005.

That places Austria 27th out of 185 countries with data for 2019, putting it in the top quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 222 days 222 days 222 days 5
2010s 222 days 222 days 222 days 10

Countries ranked near Austria

  1. 25 Nicaragua 225 days compare
  2. 26 Suriname 223 days compare
  3. 28 Central African Republic 219 days compare
  4. 29 Papua New Guinea 217 days compare
  5. 30 France 213 days compare

See the full ranking of 187 places →

More private sector data for Austria

All data for Austria →

Frequently asked questions

What is dealing with construction permits: time in Austria?
Dealing with construction permits: time in Austria was 222 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Austria?
The highest recorded value was 222 days in 2005.
What is the lowest dealing with construction permits: time recorded in Austria?
The lowest recorded value was 222 days in 2005.
How does Austria rank for dealing with construction permits: time?
Austria ranks 27th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Austria?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Austria data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.