Azerbaijan vs Mozambique: Dealing with construction permits: Time

Azerbaijan
116 days
in 2019
Mozambique
118 days
in 2019
Azerbaijan rank
118th
Mozambique rank
115th

Dealing with construction permits: Time over time

  • Azerbaijan
  • Mozambique
050100150200250200520122019

How they compare

Mozambique currently reports 118 days against 116 days in Azerbaijan, a difference of 2 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Mozambique ahead.

Azerbaijan ranks 118th and Mozambique ranks 115th of 185 countries.

Across the 2 decades both report, Azerbaijan averaged higher in 1 and Mozambique in 1.

Head to head by decade

Decade Azerbaijan Mozambique Difference Ahead
2000s 204 days 242 days 38 days Mozambique
2010s 182.2 days 159 days 23.2 days Azerbaijan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Azerbaijan or Mozambique?
Mozambique, at 118 days against 116 days in Azerbaijan as of 2019.
What is the difference in dealing with construction permits: time between Azerbaijan and Mozambique?
2 days, with Mozambique ahead.
How many years of comparable data are there for Azerbaijan and Mozambique?
15 years are reported by both, from 2005 to 2019.
How do Azerbaijan and Mozambique rank globally for dealing with construction permits: time?
Azerbaijan ranks 118th and Mozambique ranks 115th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.