Dealing with construction permits: Time (days) (Time days) in Azerbaijan

Azerbaijan: Dealing with construction permits: Time was 116 days in 2019. ▼ Falling

Latest (2019)
116 days
Change on year
unchanged
World rank
121st
of 188 countries
All-time high
213 days
in 2013
All-time low
116 days
in 2018
Years of data
15
2005–2019

Dealing with construction permits: Time in Azerbaijan, 2005–2019

0501001502002005201220192005: 204 days2006: 204 days2007: 204 days2008: 204 days2009: 204 days2010: 204 days2011: 205 days2012: 205 days2013: 213 days2014: 163 days2015: 208 days2016: 196 days2017: 196 days2018: 116 days2019: 116 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Azerbaijan stood at 116 days. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 43.1% over ten years.

Over the whole period, dealing with construction permits: time in Azerbaijan peaked at 213 days in 2013 and was at its lowest, 116 days, in 2018.

Azerbaijan ranks 121st of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Azerbaijan, year by year

Annual values for Dealing with construction permits: Time (days) in Azerbaijan, 2005 to 2019.
Year days Change
2005 204 days —
2006 204 days +0.0%
2007 204 days +0.0%
2008 204 days +0.0%
2009 204 days +0.0%
2010 204 days +0.0%
2011 205 days +0.5%
2012 205 days +0.0%
2013 213 days +3.9%
2014 163 days -23.5%
2015 208 days +27.6%
2016 196 days -5.8%
2017 196 days +0.0%
2018 116 days -40.8%
2019 116 days +0.0%

Azerbaijan compared with similar countries

  • Azerbaijan's 116 days is below the median for upper middle income countries, which is 131 days, 89% of the median. (55 countries reporting)
  • Azerbaijan's 116 days is below the median for Europe & Central Asia, which is 156 days, 74% of the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 204 days 204 days 204 days 5
2010s 182.2 days 116 days 213 days 10

Countries ranked near Azerbaijan

  1. 118 Mozambique 118 days compare
  2. 118 Nepal 118 days compare
  3. 120 Sweden 117 days compare
  4. 121 Eswatini 116 days compare
  5. 121 Saint Lucia 116 days compare
  6. 124 Seychelles 113 days compare
  7. 124 Thailand 113 days compare
  8. 124 Uganda 113 days compare

See the full ranking of 188 places →

More private sector data for Azerbaijan

All data for Azerbaijan →

Frequently asked questions

What is dealing with construction permits: time in Azerbaijan?
Dealing with construction permits: time in Azerbaijan was 116 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Azerbaijan?
The highest recorded value was 213 days in 2013.
What is the lowest dealing with construction permits: time recorded in Azerbaijan?
The lowest recorded value was 116 days in 2018.
How does Azerbaijan rank for dealing with construction permits: time?
Azerbaijan ranks 121st out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Azerbaijan?
Over the last ten years it is down 43.1%. The long-run trend across the full record is falling.
Where does this Azerbaijan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Azerbaijan. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/azerbaijan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/azerbaijan/">Dealing with construction permits: Time in Azerbaijan</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.