Dealing with construction permits: Time in Azerbaijan
Azerbaijan: Dealing with construction permits: Time was 116 days in 2019. ▼ Falling
Dealing with construction permits: Time in Azerbaijan, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Azerbaijan stood at 116 days. That is the lowest value across all 15 years on record.
Compared with earlier readings it is down 43.1% over ten years.
Over the whole period, dealing with construction permits: time in Azerbaijan peaked at 213 days in 2013 and was at its lowest, 116 days, in 2018.
Azerbaijan ranks 118th of 185 countries on this measure, in the middle of the range.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 204 days | 204 days | 204 days | 5 |
| 2010s | 182.2 days | 116 days | 213 days | 10 |
Countries ranked near Azerbaijan
More private sector data for Azerbaijan
- Merchandise trade 65.1% (2025)
- Food imports 12.4% (2025)
- Manufactures imports 53.0% (2025)
- Merchandise imports 24.38 billion current US$ (2025)
- Food exports 5.2% (2025)
- Manufactures exports 5.3% (2025)
- Merchandise exports 25.04 billion current US$ (2025)
- Commercial service exports 8.56 billion current US$ (2025)
- Transport services 17.1% (2025)
- Computer, communications and other services 65.0% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Azerbaijan?
- Dealing with construction permits: time in Azerbaijan was 116 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Azerbaijan?
- The highest recorded value was 213 days in 2013.
- What is the lowest dealing with construction permits: time recorded in Azerbaijan?
- The lowest recorded value was 116 days in 2018.
- How does Azerbaijan rank for dealing with construction permits: time?
- Azerbaijan ranks 118th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Azerbaijan?
- Over the last ten years it is down 43.1%. The long-run trend across the full record is falling.
- Where does this Azerbaijan data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.