Bahamas vs Bosnia and Herzegovina: Dealing with construction permits: Time

Bahamas
180 days
in 2019
Bosnia and Herzegovina
180 days
in 2019
Bahamas rank
53rd
Bosnia and Herzegovina rank
53rd

Dealing with construction permits: Time over time

  • Bahamas
  • Bosnia and Herzegovina
200300400500200520122019

How they compare

Bahamas currently reports 180 days against 180 days in Bosnia and Herzegovina, a difference of 0 days.

Across all 13 years both countries report, Bosnia and Herzegovina has been ahead every year.

Bahamas ranks 53rd and Bosnia and Herzegovina ranks 53rd of 188 countries.

Bosnia and Herzegovina has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Bahamas Bosnia and Herzegovina Difference Ahead
2000s 180 days 366.33 days 186.33 days Bosnia and Herzegovina
2010s 180 days 193.4 days 13.4 days Bosnia and Herzegovina

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Bahamas or Bosnia and Herzegovina?
Bahamas, at 180 days against 180 days in Bosnia and Herzegovina as of 2019.
What is the difference in dealing with construction permits: time between Bahamas and Bosnia and Herzegovina?
0 days, with Bahamas ahead.
How many years of comparable data are there for Bahamas and Bosnia and Herzegovina?
13 years are reported by both, from 2007 to 2019.
How do Bahamas and Bosnia and Herzegovina rank globally for dealing with construction permits: time?
Bahamas ranks 53rd and Bosnia and Herzegovina ranks 53rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bahamas vs Bosnia and Herzegovina: Dealing with construction permits: Time. Statizoid. Retrieved 03 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/bahamas-the/bosnia-and-herzegovina/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/bahamas-the/bosnia-and-herzegovina/">Bahamas vs Bosnia and Herzegovina: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.