Dealing with construction permits: Time in Bosnia and Herzegovina

Bosnia and Herzegovina: Dealing with construction permits: Time was 180 days in 2019. β–Ό Falling

Latest (2019)
180 days
Change on year
unchanged
World rank
52nd
of 187 countries
All-time high
515 days
in 2005
All-time low
180 days
in 2014
Years of data
15
2005–2019

Dealing with construction permits: Time in Bosnia and Herzegovina, 2005–2019

2003004005002005201220192005: 515 days2006: 500 days2007: 500 days2008: 330 days2009: 269 days2010: 269 days2011: 195 days2012: 195 days2013: 195 days2014: 180 days2015: 180 days2016: 180 days2017: 180 days2018: 180 days2019: 180 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Bosnia and Herzegovina is 180 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 33.1% over ten years.

Over the whole period, dealing with construction permits: time in Bosnia and Herzegovina peaked at 515 days in 2005 and was at its lowest, 180 days, in 2014.

That places Bosnia and Herzegovina 52nd out of 187 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 422.8 days 269 days 515 days 5
2010s 193.4 days 180 days 269 days 10

Countries ranked near Bosnia and Herzegovina

  1. 50 Lesotho 183 days compare
  2. 51 Sierra Leone 182 days compare
  3. 52 Bahamas 180 days compare
  4. 52 Greece 180 days compare
  5. 55 Malta 179 days compare

See the full ranking of 187 places β†’

More private sector data for Bosnia and Herzegovina

All data for Bosnia and Herzegovina β†’

Frequently asked questions

What is dealing with construction permits: time in Bosnia and Herzegovina?
Dealing with construction permits: time in Bosnia and Herzegovina was 180 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Bosnia and Herzegovina?
The highest recorded value was 515 days in 2005.
What is the lowest dealing with construction permits: time recorded in Bosnia and Herzegovina?
The lowest recorded value was 180 days in 2014.
How does Bosnia and Herzegovina rank for dealing with construction permits: time?
Bosnia and Herzegovina ranks 52nd out of 187 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Bosnia and Herzegovina?
Over the last ten years it is down 33.1%. The long-run trend across the full record is falling.
Where does this Bosnia and Herzegovina data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV Β· JSON β€” 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Bosnia and Herzegovina. Statizoid. Retrieved 21 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/bosnia-and-herzegovina/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/bosnia-and-herzegovina/">Dealing with construction permits: Time in Bosnia and Herzegovina</a> β€” Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.