Dealing with construction permits: Time (days) (Time days) in Bahamas

Bahamas: Dealing with construction permits: Time was 180 days in 2019. ▬ Flat

Latest (2019)
180 days
Change on year
unchanged
World rank
53rd
of 188 countries
All-time high
180 days
in 2007
All-time low
180 days
in 2007
Years of data
13
2007–2019

Dealing with construction permits: Time in Bahamas, 2007–2019

0501001502002007201320192007: 180 days2008: 180 days2009: 180 days2010: 180 days2011: 180 days2012: 180 days2013: 180 days2014: 180 days2015: 180 days2016: 180 days2017: 180 days2018: 180 days2019: 180 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Bahamas is 180 days, measured in 2019. That is the highest value across all 13 years on record.

The figure is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Bahamas peaked at 180 days in 2007 and was at its lowest, 180 days, in 2007.

Bahamas ranks 53rd of 188 countries on this measure, in the middle of the range.

Dealing with construction permits: Time in Bahamas, year by year

Annual values for Dealing with construction permits: Time (days) in Bahamas, 2007 to 2019.
Year days Change
2007 180 days —
2008 180 days +0.0%
2009 180 days +0.0%
2010 180 days +0.0%
2011 180 days +0.0%
2012 180 days +0.0%
2013 180 days +0.0%
2014 180 days +0.0%
2015 180 days +0.0%
2016 180 days +0.0%
2017 180 days +0.0%
2018 180 days +0.0%
2019 180 days +0.0%

Bahamas compared with similar countries

  • Bahamas's 180 days is above the median for high income countries, which is 144.75 days, 1.2× the median. (62 countries reporting)
  • Bahamas's 180 days is above the median for Latin America & Caribbean, which is 165 days, 1.1× the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 180 days 180 days 180 days 3
2010s 180 days 180 days 180 days 10

Countries ranked near Bahamas

  1. 51 Lesotho 183 days compare
  2. 52 Sierra Leone 182 days compare
  3. 53 Bosnia and Herzegovina 180 days compare
  4. 53 Greece 180 days compare
  5. 56 Malta 179 days compare

See the full ranking of 188 places →

More private sector data for Bahamas

All data for Bahamas →

Frequently asked questions

What is dealing with construction permits: time in Bahamas?
Dealing with construction permits: time in Bahamas was 180 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Bahamas?
The highest recorded value was 180 days in 2007.
What is the lowest dealing with construction permits: time recorded in Bahamas?
The lowest recorded value was 180 days in 2007.
How does Bahamas rank for dealing with construction permits: time?
Bahamas ranks 53rd out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Bahamas?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Bahamas data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 13 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Bahamas. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/bahamas-the/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/bahamas-the/">Dealing with construction permits: Time in Bahamas</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.