Bangladesh vs Gabon: Dealing with construction permits: Time

Bangladesh
273.52 days
in 2019
Gabon
275 days
in 2019
Bangladesh rank
13th
Gabon rank
12th

Dealing with construction permits: Time over time

  • Bangladesh
  • Gabon
0100200300200520122019

How they compare

Gabon currently reports 275 days against 273.52 days in Bangladesh, a difference of 1.48 days.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Bangladesh ahead.

Bangladesh ranks 13th and Gabon ranks 12th of 185 countries.

Bangladesh has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Bangladesh Gabon Difference Ahead
2000s 292.6 days 280 days 12.6 days Bangladesh
2010s 275.15 days 275 days 0.152 days Bangladesh

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Bangladesh or Gabon?
Gabon, at 275 days against 273.52 days in Bangladesh as of 2019.
What is the difference in dealing with construction permits: time between Bangladesh and Gabon?
1.48 days, with Gabon ahead.
How many years of comparable data are there for Bangladesh and Gabon?
15 years are reported by both, from 2005 to 2019.
How do Bangladesh and Gabon rank globally for dealing with construction permits: time?
Bangladesh ranks 13th and Gabon ranks 12th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.