Dealing with construction permits: Time in Bangladesh

Bangladesh: Dealing with construction permits: Time was 273.52 days in 2019. ▼ Falling

Latest (2019)
273.52 days
Change on year
unchanged
World rank
13th
of 185 countries
All-time high
301 days
in 2005
All-time low
272.74 days
in 2013
Years of data
15
2005–2019

Dealing with construction permits: Time in Bangladesh, 2005–2019

01002003002005201220192005: 301 days2006: 301 days2007: 301 days2008: 280 days2009: 280 days2010: 280 days2011: 280 days2012: 280 days2013: 272.7 days2014: 272.7 days2015: 272.7 days2016: 272.7 days2017: 273.5 days2018: 273.5 days2019: 273.5 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Bangladesh is 273.52 days, measured in 2019.

Compared with earlier readings it is down 2.3% over ten years.

Over the whole period, dealing with construction permits: time in Bangladesh peaked at 301 days in 2005 and was at its lowest, 272.74 days, in 2013.

Bangladesh ranks 13th of 185 countries on this measure, in the top 10%.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 292.6 days 280 days 301 days 5
2010s 275.15 days 272.74 days 280 days 10

Countries ranked near Bangladesh

  1. 10 Moldova 278 days compare
  2. 11 Lebanon 276 days compare
  3. 12 Gabon 275 days compare
  4. 14 Uruguay 265 days compare
  5. 15 Romania 260 days compare
  6. 16 Sudan 255 days compare

See the full ranking of 187 places →

More private sector data for Bangladesh

All data for Bangladesh →

Frequently asked questions

What is dealing with construction permits: time in Bangladesh?
Dealing with construction permits: time in Bangladesh was 273.52 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Bangladesh?
The highest recorded value was 301 days in 2005.
What is the lowest dealing with construction permits: time recorded in Bangladesh?
The lowest recorded value was 272.74 days in 2013.
How does Bangladesh rank for dealing with construction permits: time?
Bangladesh ranks 13th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Bangladesh?
Over the last ten years it is down 2.3%. The long-run trend across the full record is falling.
Where does this Bangladesh data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.