Dealing with construction permits: Time in Bangladesh
Bangladesh: Dealing with construction permits: Time was 273.52 days in 2019. ▼ Falling
Dealing with construction permits: Time in Bangladesh, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Bangladesh is 273.52 days, measured in 2019.
Compared with earlier readings it is down 2.3% over ten years.
Over the whole period, dealing with construction permits: time in Bangladesh peaked at 301 days in 2005 and was at its lowest, 272.74 days, in 2013.
Bangladesh ranks 13th of 185 countries on this measure, in the top 10%.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 292.6 days | 280 days | 301 days | 5 |
| 2010s | 275.15 days | 272.74 days | 280 days | 10 |
Countries ranked near Bangladesh
More private sector data for Bangladesh
- Merchandise trade 25.8% (2025)
- Food imports 13.0% (2018)
- Manufactures imports 67.0% (2018)
- Merchandise imports 69.37 billion current US$ (2025)
- Food exports 3.4% (2018)
- Manufactures exports 94.5% (2018)
- Merchandise exports 48.17 billion current US$ (2025)
- Commercial service exports 6.97 billion current US$ (2025)
- Transport services 53.2% (2025)
- Computer, communications and other services 27.1% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Bangladesh?
- Dealing with construction permits: time in Bangladesh was 273.52 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Bangladesh?
- The highest recorded value was 301 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Bangladesh?
- The lowest recorded value was 272.74 days in 2013.
- How does Bangladesh rank for dealing with construction permits: time?
- Bangladesh ranks 13th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Bangladesh?
- Over the last ten years it is down 2.3%. The long-run trend across the full record is falling.
- Where does this Bangladesh data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.