Dealing with construction permits: Time in Gabon
Gabon: Dealing with construction permits: Time was 275 days in 2019. ▬ Flat
Dealing with construction permits: Time in Gabon, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Gabon stood at 275 days.
Compared with earlier readings it is down 1.8% over ten years.
Over the whole period, dealing with construction permits: time in Gabon peaked at 335 days in 2015 and was at its lowest, 200 days, in 2014.
Gabon ranks 12th of 185 countries on this measure, in the top 10%.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 280 days | 280 days | 280 days | 5 |
| 2010s | 275 days | 200 days | 335 days | 10 |
Countries ranked near Gabon
More private sector data for Gabon
- Merchandise trade 72.8% (2025)
- Food imports 15.7% (2023)
- Manufactures imports 76.4% (2023)
- Merchandise imports 4.00 billion current US$ (2025)
- Food exports 0.9% (2023)
- Manufactures exports 17.8% (2023)
- Merchandise exports 11.60 billion current US$ (2025)
- Commercial service exports 273.34 million current US$ (2015)
- Transport services 31.2% (2015)
- Computer, communications and other services 50.6% (2015)
Frequently asked questions
- What is dealing with construction permits: time in Gabon?
- Dealing with construction permits: time in Gabon was 275 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Gabon?
- The highest recorded value was 335 days in 2015.
- What is the lowest dealing with construction permits: time recorded in Gabon?
- The lowest recorded value was 200 days in 2014.
- How does Gabon rank for dealing with construction permits: time?
- Gabon ranks 12th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Gabon?
- Over the last ten years it is down 1.8%. The long-run trend across the full record is flat.
- Where does this Gabon data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.