Bangladesh vs Moldova: Dealing with construction permits: Time (days) (Time days)

Bangladesh
273.52 days
in 2019
Moldova
278 days
in 2019
Bangladesh rank
13th
Moldova rank
10th

Dealing with construction permits: Time (days) (Time days) over time

  • Bangladesh
  • Moldova
0100200300200520122019

How they compare

Moldova currently reports 278 days against 273.52 days in Bangladesh, a difference of 4.48 days.

Across all 15 years both countries report, Moldova has been ahead every year.

Bangladesh ranks 13th and Moldova ranks 10th of 188 countries.

Moldova has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Bangladesh Moldova Difference Ahead
2000s 292.6 days 341 days 48.4 days Moldova
2010s 275.15 days 309.9 days 34.75 days Moldova

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Bangladesh or Moldova?
Moldova, at 278 days against 273.52 days in Bangladesh as of 2019.
What is the difference in dealing with construction permits: time between Bangladesh and Moldova?
4.48 days, with Moldova ahead.
How many years of comparable data are there for Bangladesh and Moldova?
15 years are reported by both, from 2005 to 2019.
How do Bangladesh and Moldova rank globally for dealing with construction permits: time?
Bangladesh ranks 13th and Moldova ranks 10th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bangladesh vs Moldova: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/bangladesh/moldova/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/bangladesh/moldova/">Bangladesh vs Moldova: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.