Bangladesh vs Uruguay: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Bangladesh
- Uruguay
How they compare
Bangladesh currently reports 273.52 days against 265 days in Uruguay, a difference of 8.52 days.
Across all 15 years both countries report, Bangladesh has been ahead every year.
Bangladesh ranks 13th and Uruguay ranks 14th of 185 countries.
Bangladesh has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Bangladesh | Uruguay | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 292.6 days | 265 days | 27.6 days | Bangladesh |
| 2010s | 275.15 days | 265 days | 10.15 days | Bangladesh |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Bangladesh or Uruguay?
- Bangladesh, at 273.52 days against 265 days in Uruguay as of 2019.
- What is the difference in dealing with construction permits: time between Bangladesh and Uruguay?
- 8.52 days, with Bangladesh ahead.
- How many years of comparable data are there for Bangladesh and Uruguay?
- 15 years are reported by both, from 2005 to 2019.
- How do Bangladesh and Uruguay rank globally for dealing with construction permits: time?
- Bangladesh ranks 13th and Uruguay ranks 14th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.