Dealing with construction permits: Time in Uruguay

Uruguay: Dealing with construction permits: Time was 265 days in 2019. ▬ Flat

Latest (2019)
265 days
Change on year
unchanged
World rank
14th
of 185 countries
All-time high
265 days
in 2005
All-time low
265 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Uruguay, 2005–2019

01002003002005201220192005: 265 days2006: 265 days2007: 265 days2008: 265 days2009: 265 days2010: 265 days2011: 265 days2012: 265 days2013: 265 days2014: 265 days2015: 265 days2016: 265 days2017: 265 days2018: 265 days2019: 265 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Uruguay stood at 265 days. That is the highest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Uruguay peaked at 265 days in 2005 and was at its lowest, 265 days, in 2005.

Uruguay ranks 14th of 185 countries on this measure, in the top 10%.

Averages by decade

DecadeAverage LowestHighest Years
2000s 265 days 265 days 265 days 5
2010s 265 days 265 days 265 days 10

Countries ranked near Uruguay

  1. 11 Lebanon 276 days compare
  2. 12 Gabon 275 days compare
  3. 13 Bangladesh 273.52 days compare
  4. 15 Romania 260 days compare
  5. 16 Sudan 255 days compare
  6. 17 Trinidad and Tobago 254 days compare

See the full ranking of 187 places →

More private sector data for Uruguay

All data for Uruguay →

Frequently asked questions

What is dealing with construction permits: time in Uruguay?
Dealing with construction permits: time in Uruguay was 265 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Uruguay?
The highest recorded value was 265 days in 2005.
What is the lowest dealing with construction permits: time recorded in Uruguay?
The lowest recorded value was 265 days in 2005.
How does Uruguay rank for dealing with construction permits: time?
Uruguay ranks 14th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Uruguay?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Uruguay data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.