Barbados vs Cyprus: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Barbados
- Cyprus
How they compare
Cyprus currently reports 507 days against 377 days in Barbados, a difference of 130 days.
That makes Cyprus's figure about 1.3 times Barbados's.
Across all 9 years both countries report, Cyprus has been ahead every year.
Barbados ranks 4th and Cyprus ranks 2nd of 185 countries.
Cyprus has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: time, Barbados or Cyprus?
- Cyprus, at 507 days against 377 days in Barbados as of 2019.
- What is the difference in dealing with construction permits: time between Barbados and Cyprus?
- 130 days, with Cyprus ahead.
- How many years of comparable data are there for Barbados and Cyprus?
- 9 years are reported by both, from 2011 to 2019.
- How do Barbados and Cyprus rank globally for dealing with construction permits: time?
- Barbados ranks 4th and Cyprus ranks 2nd of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.