Dealing with construction permits: Time in Cyprus

Cyprus: Dealing with construction permits: Time was 507 days in 2019. ▼ Falling

Latest (2019)
507 days
Change on year
unchanged
World rank
2nd
of 185 countries
All-time high
678 days
in 2008
All-time low
507 days
in 2016
Years of data
12
2008–2019

Dealing with construction permits: Time in Cyprus, 2008–2019

02004006002008201320192008: 678 days2009: 677 days2010: 677 days2011: 677 days2012: 677 days2013: 677 days2014: 677 days2015: 617 days2016: 507 days2017: 507 days2018: 507 days2019: 507 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Cyprus is 507 days, measured in 2019. That is the lowest value across all 12 years on record.

That represents a change of down 25.1% over ten years.

Over the whole period, dealing with construction permits: time in Cyprus peaked at 678 days in 2008 and was at its lowest, 507 days, in 2016.

That places Cyprus 2nd out of 185 countries with data for 2019, putting it in the top 10%.

The long-run direction has been consistently falling across the 12 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 677.5 days 677 days 678 days 2
2010s 603 days 507 days 677 days 10

Countries ranked near Cyprus

  1. 1 Cambodia 652 days compare
  2. 3 Venezuela 434 days compare
  3. 4 Barbados 377 days compare
  4. 5 Brazil 338.37 days compare

See the full ranking of 187 places →

More private sector data for Cyprus

All data for Cyprus →

Frequently asked questions

What is dealing with construction permits: time in Cyprus?
Dealing with construction permits: time in Cyprus was 507 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Cyprus?
The highest recorded value was 678 days in 2008.
What is the lowest dealing with construction permits: time recorded in Cyprus?
The lowest recorded value was 507 days in 2016.
How does Cyprus rank for dealing with construction permits: time?
Cyprus ranks 2nd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Cyprus?
Over the last ten years it is down 25.1%. The long-run trend across the full record is falling.
Where does this Cyprus data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 12 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.