Dealing with construction permits: Time in Barbados

Barbados: Dealing with construction permits: Time was 377 days in 2019. ▬ Flat

Latest (2019)
377 days
Change on year
unchanged
World rank
4th
of 185 countries
All-time high
377 days
in 2011
All-time low
377 days
in 2011
Years of data
9
2011–2019

Dealing with construction permits: Time in Barbados, 2011–2019

01002003004002011201520192011: 377 days2012: 377 days2013: 377 days2014: 377 days2015: 377 days2016: 377 days2017: 377 days2018: 377 days2019: 377 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Barbados stood at 377 days. That is the highest value across all 9 years on record.

The figure is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Barbados peaked at 377 days in 2011 and was at its lowest, 377 days, in 2011.

That places Barbados 4th out of 185 countries with data for 2019, putting it in the top 10%.

Countries ranked near Barbados

  1. 1 Cambodia 652 days compare
  2. 1 Djibouti 146 days compare
  3. 1 Kosovo 237 days compare
  4. 2 Cyprus 507 days compare
  5. 3 Venezuela, RB 434 days compare
  6. 5 Brazil 338.37 days compare
  7. 6 Albania 324 days compare
  8. 7 Argentina 318 days compare

See the full ranking of 187 places →

More private sector data for Barbados

All data for Barbados →

Frequently asked questions

What is dealing with construction permits: time in Barbados?
Dealing with construction permits: time in Barbados was 377 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Barbados?
The highest recorded value was 377 days in 2011.
What is the lowest dealing with construction permits: time recorded in Barbados?
The lowest recorded value was 377 days in 2011.
How does Barbados rank for dealing with construction permits: time?
Barbados ranks 4th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Barbados?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Barbados data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 9 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.