Barbados vs Djibouti: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Barbados
- Djibouti
How they compare
Barbados currently reports 377 days against 146 days in Djibouti, a difference of 231 days.
That makes Barbados's figure about 2.6 times Djibouti's.
Across all 9 years both countries report, Barbados has been ahead every year.
Barbados ranks 4th and Djibouti ranks 1st of 185 countries.
Barbados has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: time, Barbados or Djibouti?
- Barbados, at 377 days against 146 days in Djibouti as of 2019.
- What is the difference in dealing with construction permits: time between Barbados and Djibouti?
- 231 days, with Barbados ahead.
- How many years of comparable data are there for Barbados and Djibouti?
- 9 years are reported by both, from 2011 to 2019.
- How do Barbados and Djibouti rank globally for dealing with construction permits: time?
- Barbados ranks 4th and Djibouti ranks 1st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.