Dealing with construction permits: Time (days) (Time days) in Djibouti

Djibouti: Dealing with construction permits: Time was 146 days in 2019. ▼ Falling

Latest (2019)
146 days
Change on year
unchanged
World rank
84th
of 188 countries
All-time high
192 days
in 2007
All-time low
146 days
in 2015
Years of data
15
2005–2019

Dealing with construction permits: Time in Djibouti, 2005–2019

0501001502002005201220192005: 187 days2006: 187 days2007: 192 days2008: 192 days2009: 192 days2010: 192 days2011: 192 days2012: 192 days2013: 192 days2014: 147 days2015: 146 days2016: 146 days2017: 146 days2018: 146 days2019: 146 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Djibouti is 146 days, measured in 2019. That is the lowest value across all 15 years on record.

The figure is down 24.0% over ten years.

Over the whole period, dealing with construction permits: time in Djibouti peaked at 192 days in 2007 and was at its lowest, 146 days, in 2015.

That places Djibouti 84th out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Djibouti, year by year

Annual values for Dealing with construction permits: Time (days) in Djibouti, 2005 to 2019.
Year days Change
2005 187 days —
2006 187 days +0.0%
2007 192 days +2.7%
2008 192 days +0.0%
2009 192 days +0.0%
2010 192 days +0.0%
2011 192 days +0.0%
2012 192 days +0.0%
2013 192 days +0.0%
2014 147 days -23.4%
2015 146 days -0.7%
2016 146 days +0.0%
2017 146 days +0.0%
2018 146 days +0.0%
2019 146 days +0.0%

Djibouti compared with similar countries

  • Djibouti's 146 days is below the median for lower middle income countries, which is 159 days, 92% of the median. (47 countries reporting)
  • Djibouti's 146 days is above the median for Middle East, North Africa, Afghanistan & Pakistan, which is 127.5 days, 1.1× the median. (22 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 190 days 187 days 192 days 5
2010s 164.5 days 146 days 192 days 10

Countries ranked near Djibouti

  1. 81 Guinea 151 days compare
  2. 82 Bhutan 150 days compare
  3. 83 Spain 147 days compare
  4. 84 Croatia 146 days compare
  5. 84 Grenada 146 days compare
  6. 87 San Marino 145.5 days compare

See the full ranking of 188 places →

More private sector data for Djibouti

All data for Djibouti →

Frequently asked questions

What is dealing with construction permits: time in Djibouti?
Dealing with construction permits: time in Djibouti was 146 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Djibouti?
The highest recorded value was 192 days in 2007.
What is the lowest dealing with construction permits: time recorded in Djibouti?
The lowest recorded value was 146 days in 2015.
How does Djibouti rank for dealing with construction permits: time?
Djibouti ranks 84th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Djibouti?
Over the last ten years it is down 24.0%. The long-run trend across the full record is falling.
Where does this Djibouti data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Djibouti. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/djibouti/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/djibouti/">Dealing with construction permits: Time in Djibouti</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.