Belarus vs Luxembourg: Dealing with construction permits: Time (days) (Time days)

Belarus
158 days
in 2019
Luxembourg
155 days
in 2019
Belarus rank
75th
Luxembourg rank
78th

Dealing with construction permits: Time (days) (Time days) over time

  • Belarus
  • Luxembourg
0100200300400200520122019

How they compare

Belarus currently reports 158 days against 155 days in Luxembourg, a difference of 3 days.

Across all 14 years both countries report, Belarus has been ahead every year.

Belarus ranks 75th and Luxembourg ranks 78th of 188 countries.

Belarus has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Belarus Luxembourg Difference Ahead
2000s 286.5 days 153 days 133.5 days Belarus
2010s 163.3 days 154.8 days 8.5 days Belarus

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Belarus or Luxembourg?
Belarus, at 158 days against 155 days in Luxembourg as of 2019.
What is the difference in dealing with construction permits: time between Belarus and Luxembourg?
3 days, with Belarus ahead.
How many years of comparable data are there for Belarus and Luxembourg?
14 years are reported by both, from 2006 to 2019.
How do Belarus and Luxembourg rank globally for dealing with construction permits: time?
Belarus ranks 75th and Luxembourg ranks 78th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Belarus vs Luxembourg: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/belarus/luxembourg/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/belarus/luxembourg/">Belarus vs Luxembourg: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.