Dealing with construction permits: Time (days) (Time days) in Luxembourg

Luxembourg: Dealing with construction permits: Time was 155 days in 2019. ▬ Flat

Latest (2019)
155 days
Change on year
unchanged
World rank
78th
of 188 countries
All-time high
155 days
in 2011
All-time low
153 days
in 2006
Years of data
14
2006–2019

Dealing with construction permits: Time in Luxembourg, 2006–2019

0501001502006201220192006: 153 days2007: 153 days2008: 153 days2009: 153 days2010: 153 days2011: 155 days2012: 155 days2013: 155 days2014: 155 days2015: 155 days2016: 155 days2017: 155 days2018: 155 days2019: 155 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Luxembourg is 155 days, measured in 2019. That is the highest value across all 14 years on record.

That represents a change of up 1.3% over ten years.

Over the whole period, dealing with construction permits: time in Luxembourg peaked at 155 days in 2011 and was at its lowest, 153 days, in 2006.

Luxembourg ranks 78th of 188 countries on this measure, in the middle of the range.

Dealing with construction permits: Time in Luxembourg, year by year

Annual values for Dealing with construction permits: Time (days) in Luxembourg, 2006 to 2019.
Year days Change
2006 153 days —
2007 153 days +0.0%
2008 153 days +0.0%
2009 153 days +0.0%
2010 153 days +0.0%
2011 155 days +1.3%
2012 155 days +0.0%
2013 155 days +0.0%
2014 155 days +0.0%
2015 155 days +0.0%
2016 155 days +0.0%
2017 155 days +0.0%
2018 155 days +0.0%
2019 155 days +0.0%

Luxembourg compared with similar countries

  • Luxembourg's 155 days is above the median for high income countries, which is 144.75 days, 1.1× the median. (62 countries reporting)
  • Luxembourg's 155 days is below the median for Europe & Central Asia, which is 156 days, 99% of the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 153 days 153 days 153 days 4
2010s 154.8 days 153 days 155 days 10

Countries ranked near Luxembourg

  1. 75 Belarus 158 days compare
  2. 76 Tajikistan 157 days compare
  3. 77 Switzerland 156 days compare
  4. 78 South Africa 155 days compare
  5. 80 Malawi 153 days compare
  6. 81 Guinea 151 days compare

See the full ranking of 188 places →

More private sector data for Luxembourg

All data for Luxembourg →

Frequently asked questions

What is dealing with construction permits: time in Luxembourg?
Dealing with construction permits: time in Luxembourg was 155 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Luxembourg?
The highest recorded value was 155 days in 2011.
What is the lowest dealing with construction permits: time recorded in Luxembourg?
The lowest recorded value was 153 days in 2006.
How does Luxembourg rank for dealing with construction permits: time?
Luxembourg ranks 78th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Luxembourg?
Over the last ten years it is up 1.3%. The long-run trend across the full record is flat.
Where does this Luxembourg data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 14 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Luxembourg. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/luxembourg/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/luxembourg/">Dealing with construction permits: Time in Luxembourg</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.