Dealing with construction permits: Time (days) (Time days) in Belarus

Belarus: Dealing with construction permits: Time was 158 days in 2019. ▼ Falling

Latest (2019)
158 days
Change on year
down 1.2%
World rank
75th
of 188 countries
All-time high
370 days
in 2007
All-time low
158 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Belarus, 2005–2019

01002003004002005201220192005: 347 days2006: 347 days2007: 370 days2008: 249 days2009: 180 days2010: 170 days2011: 170 days2012: 173 days2013: 166 days2014: 159 days2015: 159 days2016: 159 days2017: 159 days2018: 160 days2019: 158 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Belarus stood at 158 days. That is the lowest value across all 15 years on record.

That represents a change of down 1.2% on the previous year and down 12.2% over ten years.

Over the whole period, dealing with construction permits: time in Belarus peaked at 370 days in 2007 and was at its lowest, 158 days, in 2019.

That places Belarus 75th out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Belarus, year by year

Annual values for Dealing with construction permits: Time (days) in Belarus, 2005 to 2019.
Year days Change
2005 347 days —
2006 347 days +0.0%
2007 370 days +6.6%
2008 249 days -32.7%
2009 180 days -27.7%
2010 170 days -5.6%
2011 170 days +0.0%
2012 173 days +1.8%
2013 166 days -4.0%
2014 159 days -4.2%
2015 159 days +0.0%
2016 159 days +0.0%
2017 159 days +0.0%
2018 160 days +0.6%
2019 158 days -1.2%

Belarus compared with similar countries

  • Belarus's 158 days is above the median for upper middle income countries, which is 131 days, 1.2× the median. (55 countries reporting)
  • Belarus's 158 days is above the median for Europe & Central Asia, which is 156 days, 1.0× the median. (49 countries reporting)

Biggest year-on-year movements

Years where Dealing with construction permits: Time in Belarus changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.

YearChange FromTo
2008 -32.7% 370 days 249 days
2009 -27.7% 249 days 180 days

Averages by decade

DecadeAverage LowestHighest Years
2000s 298.6 days 180 days 370 days 5
2010s 163.3 days 158 days 173 days 10

Countries ranked near Belarus

  1. 72 Namibia 160 days compare
  2. 72 Portugal 160 days compare
  3. 74 Kenya 159 days compare
  4. 76 Tajikistan 157 days compare
  5. 77 Switzerland 156 days compare
  6. 78 Luxembourg 155 days compare
  7. 78 South Africa 155 days compare

See the full ranking of 188 places →

More private sector data for Belarus

All data for Belarus →

Frequently asked questions

What is dealing with construction permits: time in Belarus?
Dealing with construction permits: time in Belarus was 158 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Belarus?
The highest recorded value was 370 days in 2007.
What is the lowest dealing with construction permits: time recorded in Belarus?
The lowest recorded value was 158 days in 2019.
How does Belarus rank for dealing with construction permits: time?
Belarus ranks 75th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Belarus?
Over the last ten years it is down 12.2%. The long-run trend across the full record is falling.
Where does this Belarus data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Belarus. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/belarus/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/belarus/">Dealing with construction permits: Time in Belarus</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.