Dealing with construction permits: Time in Belarus
Belarus: Dealing with construction permits: Time was 158 days in 2019. ▼ Falling
Dealing with construction permits: Time in Belarus, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Belarus stood at 158 days. That is the lowest value across all 15 years on record.
That represents a change of down 1.2% on the previous year and down 12.2% over ten years.
Over the whole period, dealing with construction permits: time in Belarus peaked at 370 days in 2007 and was at its lowest, 158 days, in 2019.
That places Belarus 73rd out of 185 countries with data for 2019, putting it in the middle of the range.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 298.6 days | 180 days | 370 days | 5 |
| 2010s | 163.3 days | 158 days | 173 days | 10 |
Countries ranked near Belarus
- 70 Namibia 160 days compare
- 70 Portugal 160 days compare
- 72 Kenya 159 days compare
- 74 Tajikistan 157 days compare
- 75 Switzerland 156 days compare
- 76 Luxembourg 155 days compare
- 76 South Africa 155 days compare
More private sector data for Belarus
- Merchandise trade 96.1% (2025)
- Food imports 10.3% (2021)
- Manufactures imports 49.4% (2021)
- Merchandise imports 48.37 billion current US$ (2025)
- Food exports 16.6% (2021)
- Manufactures exports 38.4% (2021)
- Merchandise exports 41.40 billion current US$ (2025)
- Commercial service exports 11.72 billion current US$ (2025)
- Transport services 43.6% (2021)
- Computer, communications and other services 42.3% (2021)
Frequently asked questions
- What is dealing with construction permits: time in Belarus?
- Dealing with construction permits: time in Belarus was 158 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Belarus?
- The highest recorded value was 370 days in 2007.
- What is the lowest dealing with construction permits: time recorded in Belarus?
- The lowest recorded value was 158 days in 2019.
- How does Belarus rank for dealing with construction permits: time?
- Belarus ranks 73rd out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Belarus?
- Over the last ten years it is down 12.2%. The long-run trend across the full record is falling.
- Where does this Belarus data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.