Belarus vs Switzerland: Dealing with construction permits: Time

Belarus
158 days
in 2019
Switzerland
156 days
in 2019
Belarus rank
73rd
Switzerland rank
75th

Dealing with construction permits: Time over time

  • Belarus
  • Switzerland
0100200300400200520122019

How they compare

Belarus currently reports 158 days against 156 days in Switzerland, a difference of 2 days.

Across all 15 years both countries report, Belarus has been ahead every year.

Belarus ranks 73rd and Switzerland ranks 75th of 185 countries.

Belarus has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Belarus Switzerland Difference Ahead
2000s 298.6 days 156 days 142.6 days Belarus
2010s 163.3 days 156 days 7.3 days Belarus

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Belarus or Switzerland?
Belarus, at 158 days against 156 days in Switzerland as of 2019.
What is the difference in dealing with construction permits: time between Belarus and Switzerland?
2 days, with Belarus ahead.
How many years of comparable data are there for Belarus and Switzerland?
15 years are reported by both, from 2005 to 2019.
How do Belarus and Switzerland rank globally for dealing with construction permits: time?
Belarus ranks 73rd and Switzerland ranks 75th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.