Dealing with construction permits: Time in Switzerland

Switzerland: Dealing with construction permits: Time was 156 days in 2019. ▬ Flat

Latest (2019)
156 days
Change on year
unchanged
World rank
75th
of 185 countries
All-time high
156 days
in 2005
All-time low
156 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Switzerland, 2005–2019

0501001502005201220192005: 156 days2006: 156 days2007: 156 days2008: 156 days2009: 156 days2010: 156 days2011: 156 days2012: 156 days2013: 156 days2014: 156 days2015: 156 days2016: 156 days2017: 156 days2018: 156 days2019: 156 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Switzerland is 156 days, measured in 2019. That is the highest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Switzerland peaked at 156 days in 2005 and was at its lowest, 156 days, in 2005.

Switzerland ranks 75th of 185 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 156 days 156 days 156 days 5
2010s 156 days 156 days 156 days 10

Countries ranked near Switzerland

  1. 72 Kenya 159 days compare
  2. 73 Belarus 158 days compare
  3. 74 Tajikistan 157 days compare
  4. 76 Luxembourg 155 days compare
  5. 76 South Africa 155 days compare
  6. 78 Malawi 153 days compare

See the full ranking of 187 places →

More private sector data for Switzerland

All data for Switzerland →

Frequently asked questions

What is dealing with construction permits: time in Switzerland?
Dealing with construction permits: time in Switzerland was 156 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Switzerland?
The highest recorded value was 156 days in 2005.
What is the lowest dealing with construction permits: time recorded in Switzerland?
The lowest recorded value was 156 days in 2005.
How does Switzerland rank for dealing with construction permits: time?
Switzerland ranks 75th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Switzerland?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Switzerland data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.