Belgium vs Central African Republic: Dealing with construction permits: Time

Belgium
212 days
in 2019
Central African Republic
219 days
in 2019
Belgium rank
31st
Central African Republic rank
28th

Dealing with construction permits: Time over time

  • Belgium
  • Central African Republic
050100150200200520122019

How they compare

Central African Republic currently reports 219 days against 212 days in Belgium, a difference of 7 days.

Across all 15 years both countries report, Central African Republic has been ahead every year.

Belgium ranks 31st and Central African Republic ranks 28th of 185 countries.

Central African Republic has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Belgium Central African Republic Difference Ahead
2000s 212 days 219 days 7 days Central African Republic
2010s 212 days 219 days 7 days Central African Republic

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Belgium or Central African Republic?
Central African Republic, at 219 days against 212 days in Belgium as of 2019.
What is the difference in dealing with construction permits: time between Belgium and Central African Republic?
7 days, with Central African Republic ahead.
How many years of comparable data are there for Belgium and Central African Republic?
15 years are reported by both, from 2005 to 2019.
How do Belgium and Central African Republic rank globally for dealing with construction permits: time?
Belgium ranks 31st and Central African Republic ranks 28th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.