Dealing with construction permits: Time in Central African Republic
Central African Republic: Dealing with construction permits: Time was 219 days in 2019. ▬ Flat
Dealing with construction permits: Time in Central African Republic, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Central African Republic stood at 219 days. That is the highest value across all 15 years on record.
That represents a change of unchanged over ten years.
Over the whole period, dealing with construction permits: time in Central African Republic peaked at 219 days in 2005 and was at its lowest, 219 days, in 2005.
Central African Republic ranks 28th of 185 countries on this measure, in the top quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 219 days | 219 days | 219 days | 5 |
| 2010s | 219 days | 219 days | 219 days | 10 |
Countries ranked near Central African Republic
More private sector data for Central African Republic
- Merchandise trade 27.0% (2025)
- Food imports 20.9% (2024)
- Manufactures imports 51.1% (2024)
- Merchandise imports 573.00 million current US$ (2025)
- Food exports 0.2% (2024)
- Manufactures exports 71.8% (2024)
- Merchandise exports 255.00 million current US$ (2025)
- Commercial service exports 0 current US$ (1994)
- Transport services 43.7% (1994)
- Computer, communications and other services 10.4% (1994)
Frequently asked questions
- What is dealing with construction permits: time in Central African Republic?
- Dealing with construction permits: time in Central African Republic was 219 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Central African Republic?
- The highest recorded value was 219 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Central African Republic?
- The lowest recorded value was 219 days in 2005.
- How does Central African Republic rank for dealing with construction permits: time?
- Central African Republic ranks 28th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Central African Republic?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Central African Republic data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.