Belgium vs Guyana: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Belgium
- Guyana
How they compare
Belgium currently reports 212 days against 208 days in Guyana, a difference of 4 days.
Across all 15 years both countries report, Belgium has been ahead every year.
Belgium ranks 31st and Guyana ranks 32nd of 185 countries.
Belgium has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Belgium | Guyana | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 212 days | 203.6 days | 8.4 days | Belgium |
| 2010s | 212 days | 208 days | 4 days | Belgium |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Belgium or Guyana?
- Belgium, at 212 days against 208 days in Guyana as of 2019.
- What is the difference in dealing with construction permits: time between Belgium and Guyana?
- 4 days, with Belgium ahead.
- How many years of comparable data are there for Belgium and Guyana?
- 15 years are reported by both, from 2005 to 2019.
- How do Belgium and Guyana rank globally for dealing with construction permits: time?
- Belgium ranks 31st and Guyana ranks 32nd of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.