Belgium vs Guyana: Dealing with construction permits: Time

Belgium
212 days
in 2019
Guyana
208 days
in 2019
Belgium rank
31st
Guyana rank
32nd

Dealing with construction permits: Time over time

  • Belgium
  • Guyana
050100150200200520122019

How they compare

Belgium currently reports 212 days against 208 days in Guyana, a difference of 4 days.

Across all 15 years both countries report, Belgium has been ahead every year.

Belgium ranks 31st and Guyana ranks 32nd of 185 countries.

Belgium has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Belgium Guyana Difference Ahead
2000s 212 days 203.6 days 8.4 days Belgium
2010s 212 days 208 days 4 days Belgium

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Belgium or Guyana?
Belgium, at 212 days against 208 days in Guyana as of 2019.
What is the difference in dealing with construction permits: time between Belgium and Guyana?
4 days, with Belgium ahead.
How many years of comparable data are there for Belgium and Guyana?
15 years are reported by both, from 2005 to 2019.
How do Belgium and Guyana rank globally for dealing with construction permits: time?
Belgium ranks 31st and Guyana ranks 32nd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.