Dealing with construction permits: Time (days) (Time days) in Guyana

Guyana: Dealing with construction permits: Time was 208 days in 2019. ▬ Flat

Latest (2019)
208 days
Change on year
unchanged
World rank
34th
of 188 countries
All-time high
208 days
in 2006
All-time low
186 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Guyana, 2005–2019

0501001502002005201220192005: 186 days2006: 208 days2007: 208 days2008: 208 days2009: 208 days2010: 208 days2011: 208 days2012: 208 days2013: 208 days2014: 208 days2015: 208 days2016: 208 days2017: 208 days2018: 208 days2019: 208 days

Source: World Bank. Measured in days.

Analysis

Guyana recorded 208 days for dealing with construction permits: time in 2019. That is the highest value across all 15 years on record.

The figure is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Guyana peaked at 208 days in 2006 and was at its lowest, 186 days, in 2005.

That places Guyana 34th out of 188 countries with data for 2019, putting it in the top quarter.

Dealing with construction permits: Time in Guyana, year by year

Annual values for Dealing with construction permits: Time (days) in Guyana, 2005 to 2019.
Year days Change
2005 186 days —
2006 208 days +11.8%
2007 208 days +0.0%
2008 208 days +0.0%
2009 208 days +0.0%
2010 208 days +0.0%
2011 208 days +0.0%
2012 208 days +0.0%
2013 208 days +0.0%
2014 208 days +0.0%
2015 208 days +0.0%
2016 208 days +0.0%
2017 208 days +0.0%
2018 208 days +0.0%
2019 208 days +0.0%

Guyana compared with similar countries

  • Guyana's 208 days is above the median for high income countries, which is 144.75 days, 1.4× the median. (62 countries reporting)
  • Guyana's 208 days is above the median for Latin America & Caribbean, which is 165 days, 1.3× the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 203.6 days 186 days 208 days 5
2010s 208 days 208 days 208 days 10

Countries ranked near Guyana

  1. 31 Papua New Guinea 217 days compare
  2. 32 France 213 days compare
  3. 33 Belgium 212 days compare
  4. 35 East Timor 207 days compare
  5. 36 Dominican Republic 206 days compare
  6. 37 Indonesia 200.13 days compare

See the full ranking of 188 places →

More private sector data for Guyana

All data for Guyana →

Frequently asked questions

What is dealing with construction permits: time in Guyana?
Dealing with construction permits: time in Guyana was 208 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Guyana?
The highest recorded value was 208 days in 2006.
What is the lowest dealing with construction permits: time recorded in Guyana?
The lowest recorded value was 186 days in 2005.
How does Guyana rank for dealing with construction permits: time?
Guyana ranks 34th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Guyana?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Guyana data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Guyana. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/guyana/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/guyana/">Dealing with construction permits: Time in Guyana</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.