Belize vs Equatorial Guinea: Dealing with construction permits: Time (days) (Time days)

Belize
142 days
in 2019
Equatorial Guinea
144 days
in 2019
Belize rank
91st
Equatorial Guinea rank
88th

Dealing with construction permits: Time (days) (Time days) over time

  • Belize
  • Equatorial Guinea
050100150200520122019

How they compare

Equatorial Guinea currently reports 144 days against 142 days in Belize, a difference of 2 days.

Across all 15 years both countries report, Equatorial Guinea has been ahead every year.

Belize ranks 91st and Equatorial Guinea ranks 88th of 188 countries.

Equatorial Guinea has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Belize Equatorial Guinea Difference Ahead
2000s 142 days 144 days 2 days Equatorial Guinea
2010s 142 days 144 days 2 days Equatorial Guinea

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Belize or Equatorial Guinea?
Equatorial Guinea, at 144 days against 142 days in Belize as of 2019.
What is the difference in dealing with construction permits: time between Belize and Equatorial Guinea?
2 days, with Equatorial Guinea ahead.
How many years of comparable data are there for Belize and Equatorial Guinea?
15 years are reported by both, from 2005 to 2019.
How do Belize and Equatorial Guinea rank globally for dealing with construction permits: time?
Belize ranks 91st and Equatorial Guinea ranks 88th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Belize vs Equatorial Guinea: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/belize/equatorial-guinea/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/belize/equatorial-guinea/">Belize vs Equatorial Guinea: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.