Dealing with construction permits: Time in Belize

Belize: Dealing with construction permits: Time was 142 days in 2019. ▬ Flat

Latest (2019)
142 days
Change on year
unchanged
World rank
88th
of 185 countries
All-time high
142 days
in 2005
All-time low
142 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Belize, 2005–2019

0501001502005201220192005: 142 days2006: 142 days2007: 142 days2008: 142 days2009: 142 days2010: 142 days2011: 142 days2012: 142 days2013: 142 days2014: 142 days2015: 142 days2016: 142 days2017: 142 days2018: 142 days2019: 142 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Belize stood at 142 days. That is the highest value across all 15 years on record.

The figure is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Belize peaked at 142 days in 2005 and was at its lowest, 142 days, in 2005.

Belize ranks 88th of 185 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 142 days 142 days 142 days 5
2010s 142 days 142 days 142 days 10

Countries ranked near Belize

  1. 85 Antigua and Barbuda 144 days compare
  2. 85 Equatorial Guinea 144 days compare
  3. 87 Guinea-Bissau 143 days compare
  4. 89 Fiji 141 days compare
  5. 90 Jamaica 140.5 days compare
  6. 91 Maldives 140 days compare

See the full ranking of 187 places →

More private sector data for Belize

All data for Belize →

Frequently asked questions

What is dealing with construction permits: time in Belize?
Dealing with construction permits: time in Belize was 142 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Belize?
The highest recorded value was 142 days in 2005.
What is the lowest dealing with construction permits: time recorded in Belize?
The lowest recorded value was 142 days in 2005.
How does Belize rank for dealing with construction permits: time?
Belize ranks 88th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Belize?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Belize data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.