Dealing with construction permits: Time (days) (Time days) in Belize

Belize: Dealing with construction permits: Time was 142 days in 2019. ▬ Flat

Latest (2019)
142 days
Change on year
unchanged
World rank
91st
of 188 countries
All-time high
142 days
in 2005
All-time low
142 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Belize, 2005–2019

0501001502005201220192005: 142 days2006: 142 days2007: 142 days2008: 142 days2009: 142 days2010: 142 days2011: 142 days2012: 142 days2013: 142 days2014: 142 days2015: 142 days2016: 142 days2017: 142 days2018: 142 days2019: 142 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Belize stood at 142 days. That is the highest value across all 15 years on record.

The figure is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Belize peaked at 142 days in 2005 and was at its lowest, 142 days, in 2005.

Belize ranks 91st of 188 countries on this measure, in the middle of the range.

Dealing with construction permits: Time in Belize, year by year

Annual values for Dealing with construction permits: Time (days) in Belize, 2005 to 2019.
Year days Change
2005 142 days —
2006 142 days +0.0%
2007 142 days +0.0%
2008 142 days +0.0%
2009 142 days +0.0%
2010 142 days +0.0%
2011 142 days +0.0%
2012 142 days +0.0%
2013 142 days +0.0%
2014 142 days +0.0%
2015 142 days +0.0%
2016 142 days +0.0%
2017 142 days +0.0%
2018 142 days +0.0%
2019 142 days +0.0%

Belize compared with similar countries

  • Belize's 142 days is above the median for upper middle income countries, which is 131 days, 1.1× the median. (55 countries reporting)
  • Belize's 142 days is below the median for Latin America & Caribbean, which is 165 days, 86% of the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 142 days 142 days 142 days 5
2010s 142 days 142 days 142 days 10

Countries ranked near Belize

  1. 88 Antigua and Barbuda 144 days compare
  2. 88 Equatorial Guinea 144 days compare
  3. 90 Guinea-Bissau 143 days compare
  4. 92 Fiji 141 days compare
  5. 93 Jamaica 140.5 days compare
  6. 94 Maldives 140 days compare

See the full ranking of 188 places →

More private sector data for Belize

All data for Belize →

Frequently asked questions

What is dealing with construction permits: time in Belize?
Dealing with construction permits: time in Belize was 142 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Belize?
The highest recorded value was 142 days in 2005.
What is the lowest dealing with construction permits: time recorded in Belize?
The lowest recorded value was 142 days in 2005.
How does Belize rank for dealing with construction permits: time?
Belize ranks 91st out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Belize?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Belize data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Belize. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/belize/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/belize/">Dealing with construction permits: Time in Belize</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.