Dealing with construction permits: Time in Belize
Belize: Dealing with construction permits: Time was 142 days in 2019. ▬ Flat
Dealing with construction permits: Time in Belize, 2005–2019
Source: World Bank. Measured in days.
Analysis
In 2019, dealing with construction permits: time in Belize stood at 142 days. That is the highest value across all 15 years on record.
The figure is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Belize peaked at 142 days in 2005 and was at its lowest, 142 days, in 2005.
Belize ranks 88th of 185 countries on this measure, in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 142 days | 142 days | 142 days | 5 |
| 2010s | 142 days | 142 days | 142 days | 10 |
Countries ranked near Belize
- 85 Antigua and Barbuda 144 days compare
- 85 Equatorial Guinea 144 days compare
- 87 Guinea-Bissau 143 days compare
- 89 Fiji 141 days compare
- 90 Jamaica 140.5 days compare
- 91 Maldives 140 days compare
More private sector data for Belize
- Merchandise trade 56.4% (2025)
- Food imports 19.3% (2025)
- Manufactures imports 64.2% (2025)
- Merchandise imports 1.43 billion current US$ (2025)
- Food exports 95.3% (2025)
- Manufactures exports 3.2% (2025)
- Merchandise exports 444.00 million current US$ (2025)
- Commercial service exports 1.16 billion current US$ (2025)
- Transport services 34.6% (2025)
- Computer, communications and other services 23.1% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Belize?
- Dealing with construction permits: time in Belize was 142 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Belize?
- The highest recorded value was 142 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Belize?
- The lowest recorded value was 142 days in 2005.
- How does Belize rank for dealing with construction permits: time?
- Belize ranks 88th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Belize?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Belize data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.