Bhutan vs Djibouti: Dealing with construction permits: Time (days) (Time days)

Bhutan
150 days
in 2019
Djibouti
146 days
in 2019
Bhutan rank
82nd
Djibouti rank
84th

Dealing with construction permits: Time (days) (Time days) over time

  • Bhutan
  • Djibouti
050100150200200520122019

How they compare

Bhutan currently reports 150 days against 146 days in Djibouti, a difference of 4 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Djibouti ahead.

Bhutan ranks 82nd and Djibouti ranks 84th of 188 countries.

Djibouti has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Bhutan Djibouti Difference Ahead
2000s 151 days 190 days 39 days Djibouti
2010s 150.6 days 164.5 days 13.9 days Djibouti

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Bhutan or Djibouti?
Bhutan, at 150 days against 146 days in Djibouti as of 2019.
What is the difference in dealing with construction permits: time between Bhutan and Djibouti?
4 days, with Bhutan ahead.
How many years of comparable data are there for Bhutan and Djibouti?
15 years are reported by both, from 2005 to 2019.
How do Bhutan and Djibouti rank globally for dealing with construction permits: time?
Bhutan ranks 82nd and Djibouti ranks 84th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bhutan vs Djibouti: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/bhutan/djibouti/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/bhutan/djibouti/">Bhutan vs Djibouti: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.