Dealing with construction permits: Time in Bhutan

Bhutan: Dealing with construction permits: Time was 150 days in 2019. ▬ Flat

Latest (2019)
150 days
Change on year
unchanged
World rank
80th
of 185 countries
All-time high
151 days
in 2005
All-time low
150 days
in 2016
Years of data
15
2005–2019

Dealing with construction permits: Time in Bhutan, 2005–2019

0501001502005201220192005: 151 days2006: 151 days2007: 151 days2008: 151 days2009: 151 days2010: 151 days2011: 151 days2012: 151 days2013: 151 days2014: 151 days2015: 151 days2016: 150 days2017: 150 days2018: 150 days2019: 150 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Bhutan is 150 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 0.7% over ten years.

Over the whole period, dealing with construction permits: time in Bhutan peaked at 151 days in 2005 and was at its lowest, 150 days, in 2016.

Bhutan ranks 80th of 185 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 151 days 151 days 151 days 5
2010s 150.6 days 150 days 151 days 10

Countries ranked near Bhutan

  1. 78 Malawi 153 days compare
  2. 79 Guinea 151 days compare
  3. 81 Spain 147 days compare
  4. 82 Croatia 146 days compare
  5. 82 Grenada 146 days compare

See the full ranking of 187 places →

More private sector data for Bhutan

All data for Bhutan →

Frequently asked questions

What is dealing with construction permits: time in Bhutan?
Dealing with construction permits: time in Bhutan was 150 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Bhutan?
The highest recorded value was 151 days in 2005.
What is the lowest dealing with construction permits: time recorded in Bhutan?
The lowest recorded value was 150 days in 2016.
How does Bhutan rank for dealing with construction permits: time?
Bhutan ranks 80th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Bhutan?
Over the last ten years it is down 0.7%. The long-run trend across the full record is flat.
Where does this Bhutan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.