Bhutan vs Guinea: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Bhutan
- Guinea
How they compare
Guinea currently reports 151 days against 150 days in Bhutan, a difference of 1 days.
Across all 15 years both countries report, Guinea has been ahead every year.
Bhutan ranks 80th and Guinea ranks 79th of 185 countries.
Guinea has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Bhutan | Guinea | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 151 days | 181 days | 30 days | Guinea |
| 2010s | 150.6 days | 173.1 days | 22.5 days | Guinea |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Bhutan or Guinea?
- Guinea, at 151 days against 150 days in Bhutan as of 2019.
- What is the difference in dealing with construction permits: time between Bhutan and Guinea?
- 1 days, with Guinea ahead.
- How many years of comparable data are there for Bhutan and Guinea?
- 15 years are reported by both, from 2005 to 2019.
- How do Bhutan and Guinea rank globally for dealing with construction permits: time?
- Bhutan ranks 80th and Guinea ranks 79th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.