Bosnia and Herzegovina vs Lesotho: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Bosnia and Herzegovina
- Lesotho
How they compare
Lesotho currently reports 183 days against 180 days in Bosnia and Herzegovina, a difference of 3 days.
The two have swapped places 3 times across 15 shared years of data; in 2005 it was Bosnia and Herzegovina ahead.
Bosnia and Herzegovina ranks 53rd and Lesotho ranks 51st of 188 countries.
Bosnia and Herzegovina has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Bosnia and Herzegovina | Lesotho | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 422.8 days | 375 days | 47.8 days | Bosnia and Herzegovina |
| 2010s | 193.4 days | 183 days | 10.4 days | Bosnia and Herzegovina |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Bosnia and Herzegovina or Lesotho?
- Lesotho, at 183 days against 180 days in Bosnia and Herzegovina as of 2019.
- What is the difference in dealing with construction permits: time between Bosnia and Herzegovina and Lesotho?
- 3 days, with Lesotho ahead.
- How many years of comparable data are there for Bosnia and Herzegovina and Lesotho?
- 15 years are reported by both, from 2005 to 2019.
- How do Bosnia and Herzegovina and Lesotho rank globally for dealing with construction permits: time?
- Bosnia and Herzegovina ranks 53rd and Lesotho ranks 51st of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.