Bosnia and Herzegovina vs Lesotho: Dealing with construction permits: Time

Bosnia and Herzegovina
180 days
in 2019
Lesotho
183 days
in 2019
Bosnia and Herzegovina rank
53rd
Lesotho rank
51st

Dealing with construction permits: Time over time

  • Bosnia and Herzegovina
  • Lesotho
200300400500200520122019

How they compare

Lesotho currently reports 183 days against 180 days in Bosnia and Herzegovina, a difference of 3 days.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Bosnia and Herzegovina ahead.

Bosnia and Herzegovina ranks 53rd and Lesotho ranks 51st of 188 countries.

Bosnia and Herzegovina has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Bosnia and Herzegovina Lesotho Difference Ahead
2000s 422.8 days 375 days 47.8 days Bosnia and Herzegovina
2010s 193.4 days 183 days 10.4 days Bosnia and Herzegovina

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Bosnia and Herzegovina or Lesotho?
Lesotho, at 183 days against 180 days in Bosnia and Herzegovina as of 2019.
What is the difference in dealing with construction permits: time between Bosnia and Herzegovina and Lesotho?
3 days, with Lesotho ahead.
How many years of comparable data are there for Bosnia and Herzegovina and Lesotho?
15 years are reported by both, from 2005 to 2019.
How do Bosnia and Herzegovina and Lesotho rank globally for dealing with construction permits: time?
Bosnia and Herzegovina ranks 53rd and Lesotho ranks 51st of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bosnia and Herzegovina vs Lesotho: Dealing with construction permits: Time. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/bosnia-and-herzegovina/lesotho/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/bosnia-and-herzegovina/lesotho/">Bosnia and Herzegovina vs Lesotho: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.