Dealing with construction permits: Time (days) (Time days) in Lesotho

Lesotho: Dealing with construction permits: Time was 183 days in 2019. ▼ Falling

Latest (2019)
183 days
Change on year
unchanged
World rank
51st
of 188 countries
All-time high
423 days
in 2005
All-time low
183 days
in 2009
Years of data
15
2005–2019

Dealing with construction permits: Time in Lesotho, 2005–2019

01002003004002005201220192005: 423 days2006: 423 days2007: 423 days2008: 423 days2009: 183 days2010: 183 days2011: 183 days2012: 183 days2013: 183 days2014: 183 days2015: 183 days2016: 183 days2017: 183 days2018: 183 days2019: 183 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Lesotho is 183 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Lesotho peaked at 423 days in 2005 and was at its lowest, 183 days, in 2009.

Lesotho ranks 51st of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Lesotho, year by year

Annual values for Dealing with construction permits: Time (days) in Lesotho, 2005 to 2019.
Year days Change
2005 423 days —
2006 423 days +0.0%
2007 423 days +0.0%
2008 423 days +0.0%
2009 183 days -56.7%
2010 183 days +0.0%
2011 183 days +0.0%
2012 183 days +0.0%
2013 183 days +0.0%
2014 183 days +0.0%
2015 183 days +0.0%
2016 183 days +0.0%
2017 183 days +0.0%
2018 183 days +0.0%
2019 183 days +0.0%

Lesotho compared with similar countries

  • Lesotho's 183 days is above the median for lower middle income countries, which is 159 days, 1.2× the median. (47 countries reporting)
  • Lesotho's 183 days is above the median for Sub-Saharan Africa, which is 143.5 days, 1.3× the median. (46 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 375 days 183 days 423 days 5
2010s 183 days 183 days 183 days 10

Countries ranked near Lesotho

  1. 48 Angola 184 days compare
  2. 48 Tanzania 184 days compare
  3. 48 Yemen 184 days compare
  4. 52 Sierra Leone 182 days compare
  5. 53 Bahamas 180 days compare
  6. 53 Bosnia and Herzegovina 180 days compare
  7. 53 Greece 180 days compare

See the full ranking of 188 places →

More private sector data for Lesotho

All data for Lesotho →

Frequently asked questions

What is dealing with construction permits: time in Lesotho?
Dealing with construction permits: time in Lesotho was 183 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Lesotho?
The highest recorded value was 423 days in 2005.
What is the lowest dealing with construction permits: time recorded in Lesotho?
The lowest recorded value was 183 days in 2009.
How does Lesotho rank for dealing with construction permits: time?
Lesotho ranks 51st out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Lesotho?
Over the last ten years it is unchanged. The long-run trend across the full record is falling.
Where does this Lesotho data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Lesotho. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/lesotho/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/lesotho/">Dealing with construction permits: Time in Lesotho</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.