Dealing with construction permits: Time in Lesotho

Lesotho: Dealing with construction permits: Time was 183 days in 2019. ▼ Falling

Latest (2019)
183 days
Change on year
unchanged
World rank
49th
of 185 countries
All-time high
423 days
in 2005
All-time low
183 days
in 2009
Years of data
15
2005–2019

Dealing with construction permits: Time in Lesotho, 2005–2019

01002003004002005201220192005: 423 days2006: 423 days2007: 423 days2008: 423 days2009: 183 days2010: 183 days2011: 183 days2012: 183 days2013: 183 days2014: 183 days2015: 183 days2016: 183 days2017: 183 days2018: 183 days2019: 183 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Lesotho is 183 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Lesotho peaked at 423 days in 2005 and was at its lowest, 183 days, in 2009.

Lesotho ranks 49th of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 375 days 183 days 423 days 5
2010s 183 days 183 days 183 days 10

Countries ranked near Lesotho

  1. 46 Angola 184 days compare
  2. 46 Tanzania 184 days compare
  3. 46 Yemen 184 days compare
  4. 50 Sierra Leone 182 days compare
  5. 51 Bahamas 180 days compare
  6. 51 Bosnia and Herzegovina 180 days compare
  7. 51 Greece 180 days compare

See the full ranking of 187 places →

More private sector data for Lesotho

All data for Lesotho →

Frequently asked questions

What is dealing with construction permits: time in Lesotho?
Dealing with construction permits: time in Lesotho was 183 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Lesotho?
The highest recorded value was 423 days in 2005.
What is the lowest dealing with construction permits: time recorded in Lesotho?
The lowest recorded value was 183 days in 2009.
How does Lesotho rank for dealing with construction permits: time?
Lesotho ranks 49th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Lesotho?
Over the last ten years it is unchanged. The long-run trend across the full record is falling.
Where does this Lesotho data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.