Bosnia and Herzegovina vs Malta: Dealing with construction permits: Time

Bosnia and Herzegovina
180 days
in 2019
Malta
179 days
in 2019
Bosnia and Herzegovina rank
53rd
Malta rank
56th

Dealing with construction permits: Time over time

  • Bosnia and Herzegovina
  • Malta
200300400500200520122019

How they compare

Bosnia and Herzegovina currently reports 180 days against 179 days in Malta, a difference of 1 days.

Across all 9 years both countries report, Bosnia and Herzegovina has been ahead every year.

Bosnia and Herzegovina ranks 53rd and Malta ranks 56th of 188 countries.

Bosnia and Herzegovina has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: time, Bosnia and Herzegovina or Malta?
Bosnia and Herzegovina, at 180 days against 179 days in Malta as of 2019.
What is the difference in dealing with construction permits: time between Bosnia and Herzegovina and Malta?
1 days, with Bosnia and Herzegovina ahead.
How many years of comparable data are there for Bosnia and Herzegovina and Malta?
9 years are reported by both, from 2011 to 2019.
How do Bosnia and Herzegovina and Malta rank globally for dealing with construction permits: time?
Bosnia and Herzegovina ranks 53rd and Malta ranks 56th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bosnia and Herzegovina vs Malta: Dealing with construction permits: Time. Statizoid. Retrieved 26 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/bosnia-and-herzegovina/malta/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/bosnia-and-herzegovina/malta/">Bosnia and Herzegovina vs Malta: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.