Dealing with construction permits: Time in Malta
Malta: Dealing with construction permits: Time was 179 days in 2019. ▲ Rising
Dealing with construction permits: Time in Malta, 2011–2019
Source: World Bank. Measured in days.
Analysis
Malta recorded 179 days for dealing with construction permits: time in 2019. That is the highest value across all 9 years on record.
Compared with earlier readings it is up 7.2% over ten years.
Over the whole period, dealing with construction permits: time in Malta peaked at 179 days in 2018 and was at its lowest, 167 days, in 2011.
That places Malta 54th out of 185 countries with data for 2019, putting it in the middle of the range.
Countries ranked near Malta
More private sector data for Malta
- Merchandise trade 46.9% (2025)
- Food imports 11.9% (2024)
- Manufactures imports 65.2% (2024)
- Merchandise imports 9.22 billion current US$ (2025)
- Food exports 9.7% (2024)
- Manufactures exports 76.4% (2024)
- Merchandise exports 3.82 billion current US$ (2025)
- Commercial service exports 25.00 billion current US$ (2024)
- Transport services 18.4% (2024)
- Computer, communications and other services 75.1% (2024)
Frequently asked questions
- What is dealing with construction permits: time in Malta?
- Dealing with construction permits: time in Malta was 179 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Malta?
- The highest recorded value was 179 days in 2018.
- What is the lowest dealing with construction permits: time recorded in Malta?
- The lowest recorded value was 167 days in 2011.
- How does Malta rank for dealing with construction permits: time?
- Malta ranks 54th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Malta?
- Over the last ten years it is up 7.2%. The long-run trend across the full record is rising.
- Where does this Malta data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 9 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.