Botswana vs Cabo Verde: Dealing with construction permits: Time

Botswana
102 days
in 2019
Cabo Verde
101 days
in 2019
Botswana rank
137th
Cabo Verde rank
139th

Dealing with construction permits: Time over time

  • Botswana
  • Cabo Verde
050100150200200520122019

How they compare

Botswana currently reports 102 days against 101 days in Cabo Verde, a difference of 1 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Botswana ahead.

Botswana ranks 137th and Cabo Verde ranks 139th of 185 countries.

Botswana has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Botswana Cabo Verde Difference Ahead
2000s 199 days 161 days 38 days Botswana
2010s 133.7 days 126.3 days 7.4 days Botswana

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Botswana or Cabo Verde?
Botswana, at 102 days against 101 days in Cabo Verde as of 2019.
What is the difference in dealing with construction permits: time between Botswana and Cabo Verde?
1 days, with Botswana ahead.
How many years of comparable data are there for Botswana and Cabo Verde?
15 years are reported by both, from 2005 to 2019.
How do Botswana and Cabo Verde rank globally for dealing with construction permits: time?
Botswana ranks 137th and Cabo Verde ranks 139th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.