Dealing with construction permits: Time in Cape Verde

Cape Verde: Dealing with construction permits: Time was 101 days in 2019. ▼ Falling

Latest (2019)
101 days
Change on year
down 12.2%
World rank
139th
of 185 countries
All-time high
161 days
in 2005
All-time low
101 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Cape Verde, 2005–2019

0501001502005201220192005: 161 days2006: 161 days2007: 161 days2008: 161 days2009: 161 days2010: 161 days2011: 155 days2012: 155 days2013: 116 days2014: 115 days2015: 115 days2016: 115 days2017: 115 days2018: 115 days2019: 101 days

Source: World Bank. Measured in days.

Analysis

Cape Verde recorded 101 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 12.2% on the previous year and down 37.3% over ten years.

Over the whole period, dealing with construction permits: time in Cape Verde peaked at 161 days in 2005 and was at its lowest, 101 days, in 2019.

Cape Verde ranks 139th of 185 countries on this measure, in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 161 days 161 days 161 days 5
2010s 126.3 days 101 days 161 days 10

Countries ranked near Cape Verde

  1. 136 Kazakhstan 102.5 days compare
  2. 137 Botswana 102 days compare
  3. 137 Montenegro 102 days compare
  4. 140 Saudi Arabia 100 days compare
  5. 140 Turkey 100 days compare
  6. 142 Serbia 99.5 days compare

See the full ranking of 187 places →

More private sector data for Cape Verde

All data for Cape Verde →

Frequently asked questions

What is dealing with construction permits: time in Cape Verde?
Dealing with construction permits: time in Cape Verde was 101 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Cape Verde?
The highest recorded value was 161 days in 2005.
What is the lowest dealing with construction permits: time recorded in Cape Verde?
The lowest recorded value was 101 days in 2019.
How does Cape Verde rank for dealing with construction permits: time?
Cape Verde ranks 139th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Cape Verde?
Over the last ten years it is down 37.3%. The long-run trend across the full record is falling.
Where does this Cape Verde data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.