Dealing with construction permits: Time in Botswana

Botswana: Dealing with construction permits: Time was 102 days in 2019. ▼ Falling

Latest (2019)
102 days
Change on year
unchanged
World rank
137th
of 185 countries
All-time high
199 days
in 2005
All-time low
102 days
in 2018
Years of data
15
2005–2019

Dealing with construction permits: Time in Botswana, 2005–2019

0501001502002005201220192005: 199 days2006: 199 days2007: 199 days2008: 199 days2009: 199 days2010: 199 days2011: 199 days2012: 199 days2013: 108 days2014: 108 days2015: 108 days2016: 106 days2017: 106 days2018: 102 days2019: 102 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Botswana is 102 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 48.7% over ten years.

Over the whole period, dealing with construction permits: time in Botswana peaked at 199 days in 2005 and was at its lowest, 102 days, in 2018.

That places Botswana 137th out of 185 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 199 days 199 days 199 days 5
2010s 133.7 days 102 days 199 days 10

Countries ranked near Botswana

  1. 134 Estonia 103 days compare
  2. 134 Kuwait 103 days compare
  3. 136 Kazakhstan 102.5 days compare
  4. 137 Montenegro 102 days compare
  5. 139 Cape Verde 101 days compare
  6. 140 Saudi Arabia 100 days compare
  7. 140 Turkey 100 days compare

See the full ranking of 187 places →

More private sector data for Botswana

All data for Botswana →

Frequently asked questions

What is dealing with construction permits: time in Botswana?
Dealing with construction permits: time in Botswana was 102 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Botswana?
The highest recorded value was 199 days in 2005.
What is the lowest dealing with construction permits: time recorded in Botswana?
The lowest recorded value was 102 days in 2018.
How does Botswana rank for dealing with construction permits: time?
Botswana ranks 137th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Botswana?
Over the last ten years it is down 48.7%. The long-run trend across the full record is falling.
Where does this Botswana data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.