Botswana vs Kazakhstan: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Botswana
- Kazakhstan
How they compare
Kazakhstan currently reports 102.5 days against 102 days in Botswana, a difference of 0.5 days.
Across all 15 years both countries report, Kazakhstan has been ahead every year.
Botswana ranks 137th and Kazakhstan ranks 136th of 185 countries.
Kazakhstan has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Botswana | Kazakhstan | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 199 days | 259.4 days | 60.4 days | Kazakhstan |
| 2010s | 133.7 days | 168.85 days | 35.15 days | Kazakhstan |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Botswana or Kazakhstan?
- Kazakhstan, at 102.5 days against 102 days in Botswana as of 2019.
- What is the difference in dealing with construction permits: time between Botswana and Kazakhstan?
- 0.5 days, with Kazakhstan ahead.
- How many years of comparable data are there for Botswana and Kazakhstan?
- 15 years are reported by both, from 2005 to 2019.
- How do Botswana and Kazakhstan rank globally for dealing with construction permits: time?
- Botswana ranks 137th and Kazakhstan ranks 136th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.