Dealing with construction permits: Time (days) (Time days) in Kazakhstan

Kazakhstan: Dealing with construction permits: Time was 102.5 days in 2019. ▼ Falling

Latest (2019)
102.5 days
Change on year
down 12.8%
World rank
139th
of 188 countries
All-time high
264 days
in 2005
All-time low
102.5 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Kazakhstan, 2005–2019

01002003002005201220192005: 264 days2006: 264 days2007: 264 days2008: 264 days2009: 241 days2010: 220 days2011: 220 days2012: 220 days2013: 210 days2014: 190 days2015: 173.5 days2016: 117.5 days2017: 117.5 days2018: 117.5 days2019: 102.5 days

Source: World Bank. Measured in days.

Analysis

Kazakhstan recorded 102.5 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

The figure is down 12.8% on the previous year and down 57.5% over ten years.

Over the whole period, dealing with construction permits: time in Kazakhstan peaked at 264 days in 2005 and was at its lowest, 102.5 days, in 2019.

That places Kazakhstan 139th out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Kazakhstan, year by year

Annual values for Dealing with construction permits: Time (days) in Kazakhstan, 2005 to 2019.
Year days Change
2005 264 days —
2006 264 days +0.0%
2007 264 days +0.0%
2008 264 days +0.0%
2009 241 days -8.7%
2010 220 days -8.7%
2011 220 days +0.0%
2012 220 days +0.0%
2013 210 days -4.5%
2014 190 days -9.5%
2015 173.5 days -8.7%
2016 117.5 days -32.3%
2017 117.5 days +0.0%
2018 117.5 days +0.0%
2019 102.5 days -12.8%

Kazakhstan compared with similar countries

  • Kazakhstan's 102.5 days is below the median for upper middle income countries, which is 131 days, 78% of the median. (55 countries reporting)
  • Kazakhstan's 102.5 days is below the median for Europe & Central Asia, which is 156 days, 66% of the median. (49 countries reporting)

Biggest year-on-year movements

Years where Dealing with construction permits: Time in Kazakhstan changed far more than this series normally does. A large move can be a real event or a change in how the figure was measured — the source note below says who published it.

YearChange FromTo
2016 -32.3% 173.5 days 117.5 days

Averages by decade

DecadeAverage LowestHighest Years
2000s 259.4 days 241 days 264 days 5
2010s 168.85 days 102.5 days 220 days 10

Countries ranked near Kazakhstan

  1. 136 Mauritania 104 days compare
  2. 137 Estonia 103 days compare
  3. 137 Kuwait 103 days compare
  4. 140 Botswana 102 days compare
  5. 140 Montenegro 102 days compare
  6. 142 Cape Verde 101 days compare

See the full ranking of 188 places →

More private sector data for Kazakhstan

All data for Kazakhstan →

Frequently asked questions

What is dealing with construction permits: time in Kazakhstan?
Dealing with construction permits: time in Kazakhstan was 102.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Kazakhstan?
The highest recorded value was 264 days in 2005.
What is the lowest dealing with construction permits: time recorded in Kazakhstan?
The lowest recorded value was 102.5 days in 2019.
How does Kazakhstan rank for dealing with construction permits: time?
Kazakhstan ranks 139th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Kazakhstan?
Over the last ten years it is down 57.5%. The long-run trend across the full record is falling.
Where does this Kazakhstan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Kazakhstan. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/kazakhstan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/kazakhstan/">Dealing with construction permits: Time in Kazakhstan</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.