Botswana vs Kuwait: Dealing with construction permits: Time

Botswana
102 days
in 2019
Kuwait
103 days
in 2019
Botswana rank
137th
Kuwait rank
134th

Dealing with construction permits: Time over time

  • Botswana
  • Kuwait
050100150200200520122019

How they compare

Kuwait currently reports 103 days against 102 days in Botswana, a difference of 1 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Botswana ahead.

Botswana ranks 137th and Kuwait ranks 134th of 185 countries.

Across the 2 decades both report, Botswana averaged higher in 1 and Kuwait in 1.

Head to head by decade

Decade Botswana Kuwait Difference Ahead
2000s 199 days 183 days 16 days Botswana
2010s 133.7 days 182.5 days 48.8 days Kuwait

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Botswana or Kuwait?
Kuwait, at 103 days against 102 days in Botswana as of 2019.
What is the difference in dealing with construction permits: time between Botswana and Kuwait?
1 days, with Kuwait ahead.
How many years of comparable data are there for Botswana and Kuwait?
15 years are reported by both, from 2005 to 2019.
How do Botswana and Kuwait rank globally for dealing with construction permits: time?
Botswana ranks 137th and Kuwait ranks 134th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.