Brazil vs El Salvador: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Brazil
- El Salvador
How they compare
Brazil currently reports 338.37 days against 310 days in El Salvador, a difference of 28.37 days.
That makes Brazil's figure about 1.1 times El Salvador's.
Across all 15 years both countries report, Brazil has been ahead every year.
Brazil ranks 5th and El Salvador ranks 8th of 185 countries.
Brazil has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Brazil | El Salvador | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 378.2 days | 176.2 days | 202 days | Brazil |
| 2010s | 361.36 days | 184.7 days | 176.66 days | Brazil |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Brazil or El Salvador?
- Brazil, at 338.37 days against 310 days in El Salvador as of 2019.
- What is the difference in dealing with construction permits: time between Brazil and El Salvador?
- 28.37 days, with Brazil ahead.
- How many years of comparable data are there for Brazil and El Salvador?
- 15 years are reported by both, from 2005 to 2019.
- How do Brazil and El Salvador rank globally for dealing with construction permits: time?
- Brazil ranks 5th and El Salvador ranks 8th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.