Brazil vs El Salvador: Dealing with construction permits: Time

Brazil
338.37 days
in 2019
El Salvador
310 days
in 2019
Brazil rank
5th
El Salvador rank
8th

Dealing with construction permits: Time over time

  • Brazil
  • El Salvador
100200300400200520122019

How they compare

Brazil currently reports 338.37 days against 310 days in El Salvador, a difference of 28.37 days.

That makes Brazil's figure about 1.1 times El Salvador's.

Across all 15 years both countries report, Brazil has been ahead every year.

Brazil ranks 5th and El Salvador ranks 8th of 185 countries.

Brazil has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Brazil El Salvador Difference Ahead
2000s 378.2 days 176.2 days 202 days Brazil
2010s 361.36 days 184.7 days 176.66 days Brazil

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Brazil or El Salvador?
Brazil, at 338.37 days against 310 days in El Salvador as of 2019.
What is the difference in dealing with construction permits: time between Brazil and El Salvador?
28.37 days, with Brazil ahead.
How many years of comparable data are there for Brazil and El Salvador?
15 years are reported by both, from 2005 to 2019.
How do Brazil and El Salvador rank globally for dealing with construction permits: time?
Brazil ranks 5th and El Salvador ranks 8th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.