Brazil vs Venezuela: Dealing with construction permits: Time

Brazil
338.37 days
in 2019
Venezuela
434 days
in 2019
Brazil rank
5th
Venezuela rank
3rd

Dealing with construction permits: Time over time

  • Brazil
  • Venezuela
0100200300400200520122019

How they compare

Venezuela currently reports 434 days against 338.37 days in Brazil, a difference of 95.63 days.

That makes Venezuela's figure about 1.3 times Brazil's.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Venezuela ahead.

Brazil ranks 5th and Venezuela ranks 3rd of 185 countries.

Venezuela has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Brazil Venezuela Difference Ahead
2000s 378.2 days 381 days 2.8 days Venezuela
2010s 361.36 days 402.2 days 40.84 days Venezuela

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Brazil or Venezuela?
Venezuela, at 434 days against 338.37 days in Brazil as of 2019.
What is the difference in dealing with construction permits: time between Brazil and Venezuela?
95.63 days, with Venezuela ahead.
How many years of comparable data are there for Brazil and Venezuela?
15 years are reported by both, from 2005 to 2019.
How do Brazil and Venezuela rank globally for dealing with construction permits: time?
Brazil ranks 5th and Venezuela ranks 3rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.