Dealing with construction permits: Time (days) (Time days) in Venezuela

Venezuela: Dealing with construction permits: Time was 434 days in 2019. ▲ Rising

Latest (2019)
434 days
Change on year
unchanged
World rank
3rd
of 188 countries
All-time high
434 days
in 2016
All-time low
381 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Venezuela, 2005–2019

01002003004002005201220192005: 381 days2006: 381 days2007: 381 days2008: 381 days2009: 381 days2010: 381 days2011: 381 days2012: 381 days2013: 381 days2014: 381 days2015: 381 days2016: 434 days2017: 434 days2018: 434 days2019: 434 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Venezuela is 434 days, measured in 2019. That is the highest value across all 15 years on record.

Compared with earlier readings it is up 13.9% over ten years.

Over the whole period, dealing with construction permits: time in Venezuela peaked at 434 days in 2016 and was at its lowest, 381 days, in 2005.

Venezuela ranks 3rd of 188 countries on this measure, in the top 10%.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Time in Venezuela, year by year

Annual values for Dealing with construction permits: Time (days) in Venezuela, 2005 to 2019.
Year days Change
2005 381 days —
2006 381 days +0.0%
2007 381 days +0.0%
2008 381 days +0.0%
2009 381 days +0.0%
2010 381 days +0.0%
2011 381 days +0.0%
2012 381 days +0.0%
2013 381 days +0.0%
2014 381 days +0.0%
2015 381 days +0.0%
2016 434 days +13.9%
2017 434 days +0.0%
2018 434 days +0.0%
2019 434 days +0.0%

Venezuela compared with similar countries

  • Venezuela's 434 days is above the median for lower middle income countries, which is 159 days, 2.7× the median. (47 countries reporting)
  • Venezuela's 434 days is above the median for Latin America & Caribbean, which is 165 days, 2.6× the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 381 days 381 days 381 days 5
2010s 402.2 days 381 days 434 days 10

Countries ranked near Venezuela

  1. 1 Cambodia 652 days compare
  2. 2 Cyprus 507 days compare
  3. 4 Barbados 377 days compare
  4. 5 Brazil 338.37 days compare
  5. 6 Albania 324 days compare

See the full ranking of 188 places →

More private sector data for Venezuela

All data for Venezuela →

Frequently asked questions

What is dealing with construction permits: time in Venezuela?
Dealing with construction permits: time in Venezuela was 434 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Venezuela?
The highest recorded value was 434 days in 2016.
What is the lowest dealing with construction permits: time recorded in Venezuela?
The lowest recorded value was 381 days in 2005.
How does Venezuela rank for dealing with construction permits: time?
Venezuela ranks 3rd out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Venezuela?
Over the last ten years it is up 13.9%. The long-run trend across the full record is rising.
Where does this Venezuela data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Venezuela. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/venezuela-rb/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/venezuela-rb/">Dealing with construction permits: Time in Venezuela</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.