Dealing with construction permits: Time in Venezuela, RB

Venezuela, RB: Dealing with construction permits: Time was 434 days in 2019. ▲ Rising

Latest (2019)
434 days
Change on year
unchanged
World rank
3rd
of 185 countries
All-time high
434 days
in 2016
All-time low
381 days
in 2005
Years of data
15
2005–2019

Dealing with construction permits: Time in Venezuela, RB, 2005–2019

01002003004002005201220192005: 381 days2006: 381 days2007: 381 days2008: 381 days2009: 381 days2010: 381 days2011: 381 days2012: 381 days2013: 381 days2014: 381 days2015: 381 days2016: 434 days2017: 434 days2018: 434 days2019: 434 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Venezuela, RB is 434 days, measured in 2019. That is the highest value across all 15 years on record.

Compared with earlier readings it is up 13.9% over ten years.

Over the whole period, dealing with construction permits: time in Venezuela, RB peaked at 434 days in 2016 and was at its lowest, 381 days, in 2005.

Venezuela, RB ranks 3rd of 185 countries on this measure, in the top 10%.

The long-run direction has been consistently rising across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 381 days 381 days 381 days 5
2010s 402.2 days 381 days 434 days 10

Countries ranked near Venezuela, RB

  1. 1 Cambodia 652 days compare
  2. 1 Djibouti 146 days compare
  3. 1 Kosovo 237 days compare
  4. 2 Cyprus 507 days compare
  5. 4 Barbados 377 days compare
  6. 5 Brazil 338.37 days compare
  7. 6 Albania 324 days compare

See the full ranking of 187 places →

More private sector data for Venezuela, RB

All data for Venezuela, RB →

Frequently asked questions

What is dealing with construction permits: time in Venezuela, RB?
Dealing with construction permits: time in Venezuela, RB was 434 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Venezuela, RB?
The highest recorded value was 434 days in 2016.
What is the lowest dealing with construction permits: time recorded in Venezuela, RB?
The lowest recorded value was 381 days in 2005.
How does Venezuela, RB rank for dealing with construction permits: time?
Venezuela, RB ranks 3rd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Venezuela, RB?
Over the last ten years it is up 13.9%. The long-run trend across the full record is rising.
Where does this Venezuela, RB data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.